A-01 ICAM identity provider and policy decision point
The only row in the register that every mission depends on without exception. Criticality is 5 by construction; exposure is 5 because it fronts external-user self-service.
- Pool
- Identity assets
- Weight
- 25 5 × 5
- Coverage
- 50%
- Residual
- 12.5 pts
- Missions it carries outright
A-02 PKI and PIV credential service
Carries the staff-facing missions only. Exposure is lower than the identity provider because it is not reachable from the public tier.
- Pool
- Identity assets
- Tower · sub-tower
- T1 IdentityAuthentication (phishing-resistant MFA)
- Weight
- 15 5 × 3
- Coverage
- 75%
- Residual
- 3.8 pts
- Missions it carries outright
A-03 External-user account directory
Citizens, businesses, partners and their agents. Maximal exposure, and the population the agency has the least control over — no device management, no joiner-mover-leaver process, no training.
- Pool
- Identity assets
- Tower · sub-tower
- T1 IdentityAuthentication (phishing-resistant MFA)
- Weight
- 20 4 × 5
- Coverage
- 75%
- Residual
- 5 pts
- Missions it carries outright
A-04 Privileged accounts and the access broker
No mission stops if the broker stops — administration pauses. The weight is high anyway, because this is how the estate is operated and therefore how it would be operated against.
- Pool
- Identity assets
- Tower · sub-tower
- T1 IdentityPrivileged Access (JIT/PAM)
- Weight
- 20 5 × 4
- Coverage
- 50%
- Residual
- 10 pts
- Missions it carries outright
- Nothing outright — allocated only.
A-05 Service and workload identities
Non-person entities: service accounts, workload identities, pipeline credentials. Routinely over-permissioned and rarely recertified, because the governance process was built for humans.
- Pool
- Identity assets
- Weight
- 16 4 × 4
- Coverage
- 50%
- Residual
- 8 pts
- Missions it carries outright
- Nothing outright — allocated only.
A-06 Mission-staff laptops
Low criticality, maximal exposure — the inversion the device layer is built around. One laptop is worth little; it holds a live session to the tier where records are.
- Pool
- Device assets
- Tower · sub-tower
- T2 DevicesDevice Compliance / Posture
- Weight
- 15 3 × 5
- Coverage
- 50%
- Residual
- 7.5 pts
- Missions it carries outright
A-07 Contractor and integrator endpoints
Managed by somebody else, to a standard the agency reads about in a contract clause rather than in a posture signal.
- Pool
- Device assets
- Weight
- 15 3 × 5
- Coverage
- 50%
- Residual
- 7.5 pts
- Missions it carries outright
- Nothing outright — allocated only.
A-08 Server and virtual-machine fleet
The estate that did not move to containers. Lower exposure than the endpoints, and considerably longer-lived, which is the same thing said twice.
- Pool
- Device assets
- Tower · sub-tower
- T2 DevicesServer / Workload Hardening
- Weight
- 12 4 × 3
- Coverage
- 50%
- Residual
- 6 pts
- Missions it carries outright
A-09 Build agents and developer workstations
Devices with a route to the pipeline. Weighted as device assets, but their consequence is an application-layer consequence.
- Pool
- Device assets
- Tower · sub-tower
- T2 DevicesEndpoint Protection (EDR)
- Weight
- 16 4 × 4
- Coverage
- 75%
- Residual
- 4 pts
- Missions it carries outright
- Nothing outright — allocated only.
A-10 TIC 3.0 access points
Every public-facing mission crosses here. Case processing does not appear, because its users are already inside — which is exactly why the boundary below matters more to it.
- Pool
- Network assets
- Weight
- 25 5 × 5
- Coverage
- 75%
- Residual
- 6.3 pts
- Missions it carries outright
A-11 Edge delivery and volumetric scrubbing
The availability control for the missions where availability is a statutory property rather than a service target.
- Pool
- Network assets
- Weight
- 20 4 × 5
- Coverage
- 75%
- Residual
- 5 pts
- Missions it carries outright
A-12 Web application firewall fronting the public tier
Shares a sub-tower with the scrubbing edge and therefore shares its coverage, which is a fair simplification and worth naming as one.
- Pool
- Network assets
- Weight
- 16 4 × 4
- Coverage
- 75%
- Residual
- 4 pts
- Missions it carries outright
A-13 The public-tier / mission-tier boundary
The decisive point on the network layer: the crossing an adversary who has taken a public service must make for the compromise to be worth anything.
- Pool
- Network assets
- Weight
- 20 5 × 4
- Coverage
- 50%
- Residual
- 10 pts
- Missions it carries outright
A-14 Authoritative and recursive DNS
The second row every mission depends on. It is in the register for the resolution service, and it earns its weight twice over as the estate’s most under-read egress telemetry.
- Pool
- Network assets
- Weight
- 16 4 × 4
- Coverage
- 50%
- Residual
- 8 pts
- Missions it carries outright
A-15 The public service portal
The front door. Maximal on both axes, and the asset most likely to be tested by somebody the agency did not invite.
- Pool
- Application assets
- Weight
- 25 5 × 5
- Coverage
- 50%
- Residual
- 12.5 pts
- Missions it carries outright
A-16 The case filing front door
Intake and e-filing. The asset where an availability failure converts directly into a missed statutory receipt date.
- Pool
- Application assets
- Weight
- 25 5 × 5
- Coverage
- 50%
- Residual
- 12.5 pts
- Missions it carries outright
A-17 The case processing system
Where records are worked. Lower exposure, because access is mediated internally — and the highest consequence in the register, because access here is access to records in volume.
- Pool
- Application assets
- Weight
- 15 5 × 3
- Coverage
- 50%
- Residual
- 7.5 pts
- Missions it carries outright
A-18 The administrative adjudication docket
Lower volume than case processing and a harder deadline, which is a different risk profile wearing the same technology.
- Pool
- Application assets
- Weight
- 12 4 × 3
- Coverage
- 50%
- Residual
- 6 pts
- Missions it carries outright
A-19 Secondary public service portals
Delivered by a different program on a different schedule. The exposure is the same as the primary portal; the attention is not.
- Pool
- Application assets
- Weight
- 15 3 × 5
- Coverage
- 50%
- Residual
- 7.5 pts
- Missions it carries outright
A-20 The public bulk data and open API surface
Confidentiality is deliberately low here, so criticality reads low on a data-derived scale and the real exposure — enumeration and abuse at scale — sits in the integrity and availability columns nobody scores.
- Pool
- Application assets
- Weight
- 15 3 × 5
- Coverage
- 50%
- Residual
- 7.5 pts
- Missions it carries outright
A-21 The fee and payment application
The only asset in the register facing a sustained, financially motivated adversary as well as a nation-state one.
- Pool
- Application assets
- Weight
- 25 5 × 5
- Coverage
- 50%
- Residual
- 12.5 pts
- Missions it carries outright
A-22 The CI/CD pipeline
The decisive point on the application layer, and it carries no mission. An availability-derived register would rate this asset near zero, which is the precise reason the model weights criticality by consequence rather than by outage.
- Pool
- Application assets
- Weight
- 20 5 × 4
- Coverage
- 50%
- Residual
- 10 pts
- Missions it carries outright
- Nothing outright — allocated only.
A-23 Container platform and orchestration
Carries no mission by name and hosts most of them. The admission point is where an unsigned or over-privileged image is either stopped or not.
- Pool
- Cloud workload assets
- Weight
- 16 4 × 4
- Coverage
- 50%
- Residual
- 8 pts
- Missions it carries outright
- Nothing outright — allocated only.
A-24 Secrets store for workload credentials
Holds the credentials the non-person identities present. Compromise here is an identity-layer event that the register files under cloud, which is a seam worth knowing about.
- Pool
- Cloud workload assets
- Weight
- 15 5 × 3
- Coverage
- 50%
- Residual
- 7.5 pts
- Missions it carries outright
- Nothing outright — allocated only.
A-25 Sensitive mission records
The crown jewels: pre-decisional, non-public, and the holding whose loss is least reversible. Every other row in this register exists to keep somebody off this one.
- Pool
- Data assets
- Tower · sub-tower
- T5 DataData Access Governance
- Weight
- 20 5 × 4
- Coverage
- 50%
- Residual
- 10 pts
- Missions it carries outright
A-26 The external-user PII store
The privacy exposure. Its criticality comes from the obligation attached to it rather than from the mission value of the records.
- Pool
- Data assets
- Tower · sub-tower
- T5 DataClassification
- Weight
- 20 5 × 4
- Coverage
- 50%
- Residual
- 10 pts
- Missions it carries outright
A-27 The fee and financial database
The accounting record. Integrity dominates: a quietly altered ledger is worse than a stolen one, and far harder to notice.
- Pool
- Data assets
- Tower · sub-tower
- T5 DataEncryption & Key Management
- Weight
- 15 5 × 3
- Coverage
- 75%
- Residual
- 3.8 pts
- Missions it carries outright
A-28 Published bulk-data extracts
Deliberately public. The classification sub-tower carries it because the risk is an extract containing more than the dissemination decision authorized.
- Pool
- Data assets
- Tower · sub-tower
- T5 DataClassification
- Weight
- 15 3 × 5
- Coverage
- 50%
- Residual
- 7.5 pts
- Missions it carries outright
A-29 Audit and telemetry record stores
The evidence base for every claim on this site. It carries no mission and it is the first thing an adversary edits.
- Pool
- Data assets
- Tower · sub-tower
- T5 DataData Access Governance
- Weight
- 12 4 × 3
- Coverage
- 50%
- Residual
- 6 pts
- Missions it carries outright
- Nothing outright — allocated only.
A-30 Analytic and non-production copies of mission data
The copies. Same records, a fraction of the governance, and almost never in the authorization boundary that was assessed.
- Pool
- Data assets
- Weight
- 16 4 × 4
- Coverage
- 25%
- Residual
- 12 pts
- Missions it carries outright
- Nothing outright — allocated only.
A-31 Building control and physical access systems
Holds no data and can stop a data center. A consequence model derived from records exposed scores this at 1; doctrine scores it at 4.
- Pool
- Operational technology assets
- Weight
- 12 4 × 3
- Coverage
- 50%
- Residual
- 6 pts
- Missions it carries outright
- Nothing outright — allocated only.
A-32 Public-counter and laboratory instrumentation
Mission-supporting equipment on a general-purpose network. It carries a mission that does not draw on the operational-technology layer at all — the one place in this register where the two directions of the trace disagree, and it is left visible rather than tidied away.
- Pool
- Operational technology assets
- Weight
- 8 2 × 4
- Coverage
- 25%
- Residual
- 6 pts
- Missions it carries outright
A-33 Engineering workstations for facility systems
The crossing point between the two estates, operated by people whose profession is availability rather than confidentiality.
- Pool
- Operational technology assets
- Weight
- 8 4 × 2
- Coverage
- 25%
- Residual
- 6 pts
- Missions it carries outright
- Nothing outright — allocated only.
A-34 The privileged administrator population
A population, not a machine. Weighted at the top of the register because the question "who holds privilege today" is the one most estates answer from memory.
- Pool
- Workforce assets
- Weight
- 20 5 × 4
- Coverage
- 50%
- Residual
- 10 pts
- Missions it carries outright
- Nothing outright — allocated only.
A-35 Mission staff with volume record access
Individually low-privilege, collectively the crown-jewel access path. The only workforce row that carries a mission directly, because these are the people the mission is performed by.
- Pool
- Workforce assets
- Weight
- 16 4 × 4
- Coverage
- 25%
- Residual
- 12 pts
- Missions it carries outright
A-36 Contractor and vendor staff with production access
The population whose departures the agency learns about last, which is why the sub-tower is separation tempo rather than headcount.
- Pool
- Workforce assets
- Weight
- 20 4 × 5
- Coverage
- 50%
- Residual
- 10 pts
- Missions it carries outright
- Nothing outright — allocated only.
A-37 The defending team itself
Terrain that is also the force. A saturated team is a coverage problem on every other row in this register simultaneously.
- Pool
- Workforce assets
- Weight
- 12 4 × 3
- Coverage
- 50%
- Residual
- 6 pts
- Missions it carries outright
- Nothing outright — allocated only.
A-38 Primary data center and equipment rooms
Low exposure, maximal consequence — the inverse of the endpoint rows, and the reason a purely logical model mis-scores it.
- Pool
- Facility assets
- Weight
- 10 5 × 2
- Coverage
- 50%
- Residual
- 5 pts
- Missions it carries outright
A-39 Environmental plant serving production
Cooling and power. It fails in the order it happens to fail rather than in the order the mission would choose, unless somebody has said otherwise in advance.
- Pool
- Facility assets
- Weight
- 8 4 × 2
- Coverage
- 50%
- Residual
- 4 pts
- Missions it carries outright
- Nothing outright — allocated only.
A-40 Vendor maintenance routes into production space
Physical access granted on a work order. The highest-exposure facility row, and the one least likely to appear on a network diagram.
- Pool
- Facility assets
- Weight
- 16 4 × 4
- Coverage
- 25%
- Residual
- 12 pts
- Missions it carries outright
- Nothing outright — allocated only.
A-41 Managed service providers with production access
Standing access held by an organization the agency does not operate. Carries no mission and can reach most of them.
- Pool
- Supply-chain assets
- Weight
- 20 4 × 5
- Coverage
- 50%
- Residual
- 10 pts
- Missions it carries outright
- Nothing outright — allocated only.
A-42 Third-party components in mission applications
The dependency tree. The register row that a national advisory arrives about, on a clock, expecting an inventory answer.
- Pool
- Supply-chain assets
- Weight
- 16 4 × 4
- Coverage
- 25%
- Residual
- 12 pts
- Missions it carries outright
- Nothing outright — allocated only.
A-43 Vendor update channels into the estate
The route a trusted change arrives by, which is the route an untrusted one arrives by. Doctrinally this is a line of communication, and it is defended like logistics.
- Pool
- Supply-chain assets
- Weight
- 20 5 × 4
- Coverage
- 50%
- Residual
- 10 pts
- Missions it carries outright
- Nothing outright — allocated only.
A-44 The telemetry and analytics platform
Reconnaissance. Every detection claim on this site is downstream of it, and no mission draws on the layer it sits on.
- Pool
- Cross-cutting assets
- Weight
- 15 5 × 3
- Coverage
- 50%
- Residual
- 7.5 pts
- Missions it carries outright
- Nothing outright — allocated only.
A-45 Orchestration and response tooling
Mobility. It converts a decision into an action inside the adversary’s decision window, or it does not and the coverage figures above are theoretical.
- Pool
- Cross-cutting assets
- Weight
- 12 4 × 3
- Coverage
- 50%
- Residual
- 6 pts
- Missions it carries outright
- Nothing outright — allocated only.
A-46 The rules of engagement and the cycle record
Command authority as an asset. Without a standing authorization to act, every maneuver in the catalog is a proposal.
- Pool
- Cross-cutting assets
- Weight
- 10 5 × 2
- Coverage
- 75%
- Residual
- 2.5 pts
- Missions it carries outright