ASOM-Fedv6.1Open the explorer
Reference manual · the Bill of Defense

Every Mission Gets a Bill. This Is What Is on It.

The tower model allocates upward: assets carry a defensive weight, weight rolls through sub-towers into towers, towers are consumed by forms of maneuver, and the whole thing arrives at a mission consumer as a Bill of Defense — what defends this mission, how much of it, and what is left over. Six missions, a 46-row asset register beneath them, and the trace run in both directions: pick a mission and see everything defending it, or pick an asset and see every mission it serves.

Every figure on this page is illustrative

The criticality and exposure scores, the maturity levels the coverage percentages come from, and the recovery objectives are all the Federal Reference Agency profile — a plausible mid-adoption civilian agency, and never a named one. They are not an assessment, not a target, and not a claim about any real estate. They exist so the rollup can be shown working end to end. An adopter replaces every one of them with their own numbers; the shape of the answer is the deliverable, not the arithmetic.

6Mission consumersLayer 3 of the tower model. Each one gets a bill.
46Assets in the registerLayer 0, across 11 pools. Illustrative profile.
755Defensive weight pointsCriticality × exposure, summed. Illustrative.
2.2 ptsSpread across the six billsThe convergence is the finding, not the precision.
How a Bill Is Built

Coverage Flows Upward the Way Cost Does, and Arrives as a Bill.

The model borrows its shape from technology cost allocation, where spend flows from pools through towers to the units that consume it. What flows here is not money — it is defensive coverage and the residual risk left behind it. The provenance of the analogy, and what the framework deliberately does not take from it, is set out on the sources page.

Exhibit 1

The Allocation Chain, with Every Count Taken from the Data It Describes

  1. Layer 0

    Asset pools46 assets · 11 pools

    Every asset carries a defensive weight — criticality multiplied by exposure, 1 to 25. This is the allocation driver, and nothing above it can be computed without it.

  2. Layer 1a

    Sub-towers39 sub-towers

    Each asset sits under one sub-tower and inherits its maturity as a coverage percentage. Coverage is never scored twice: the 156 authored ladder statements in the terrain reference are the only place a maturity judgment is made.

  3. Layer 1b

    Defense towers10 layers

    Sub-towers roll into towers as a weighted mean. A tower’s coverage is what a mission drawing on it actually receives.

  4. Layer 2

    Maneuver solutions11 forms · 154 techniques

    Forms of maneuver consume tower capability to produce defensive outcomes. Which forms reach a mission is derived from the layers their techniques are emplaced on.

  5. Layer 3

    Mission consumers6 missions

    The bill arrives here: weighted coverage, residual risk in points and per cent, and the assets, controls and maneuvers behind both numbers.

Nothing in this chain is asserted twice. An asset inherits its coverage from the sub-tower responsible for it; a tower rolls up from its sub-towers; a mission rolls up from the towers it declares it draws on. A number stated at one level and re-stated at another is how a model starts disagreeing with itself.
How to read the four numbers
Weight
Criticality × exposure, 1–25. A mission’s total weight is the sum of what it declares it draws from each layer. Weight is a claim on defense, not a measure of size.
Coverage
The weighted mean of the coverage of every layer the mission draws on, where a layer’s coverage is the weighted mean of its sub-towers’ maturity. It is a percentage of nothing physical — it is the model’s conversion of a maturity judgment into something that can be averaged.
Residual per cent
100 minus coverage. Easy to read and actively misleading on its own, because it treats a mission with 127 weight points and one with 66 as though they were the same size.
Residual points
Weight multiplied by coverage gap, per layer, summed. This is the figure that ranks. The same 10-point gap is worth 2.5 points on a peripheral asset and 25 on the objective.
The Six Bills

Side by Side, and the Thing They Refuse to Show You.

Read across first, then read the spread. Six missions assessed against ten layers produce six coverage figures that land inside 2.2 points of each other — and residual weights that differ by a factor of 1.99. One of those two numbers is doing work.

Mission consumerTotal weightCoverageResidual riskLayers drawn onAssets carrying itHeaviest dependency
Public service deliveryThe public service portal and external-user accounts11853.7%54.7 pts 46.3%7 of 109 outright · 37 allocatedT1 Identity · weight 25
Case processing and adjudicationThe case processing system and mission-staff workflow12752.4%60.5 pts 47.6%8 of 1010 outright · 40 allocatedT5 Data · weight 25
Administrative adjudicationThe administrative adjudication and e-filing systems9853.2%45.9 pts 46.8%7 of 1012 outright · 37 allocatedT1 Identity · weight 20
Secondary public serviceAdditional public service lines and secondary portals7554.4%34.2 pts 45.6%6 of 1010 outright · 33 allocatedT4 Applications and Workloads · weight 16
Public data servicesBulk data and open API surfaces6653.7%30.6 pts 46.3%5 of 106 outright · 29 allocatedT4 Applications and Workloads · weight 20
Fee and financial operationsFee, payment and financial data systems12752.2%60.8 pts 47.8%8 of 109 outright · 40 allocatedT1 Identity · weight 25

Public service delivery

The public service portal and external-user accounts

Total weight
118
Coverage
53.7%
Residual risk
54.7 pts 46.3%
Layers drawn on
7 of 10
Assets carrying it
9 outright · 37 allocated
Heaviest dependency
T1 Identity · weight 25

Case processing and adjudication

The case processing system and mission-staff workflow

Total weight
127
Coverage
52.4%
Residual risk
60.5 pts 47.6%
Layers drawn on
8 of 10
Assets carrying it
10 outright · 40 allocated
Heaviest dependency
T5 Data · weight 25

Administrative adjudication

The administrative adjudication and e-filing systems

Total weight
98
Coverage
53.2%
Residual risk
45.9 pts 46.8%
Layers drawn on
7 of 10
Assets carrying it
12 outright · 37 allocated
Heaviest dependency
T1 Identity · weight 20

Secondary public service

Additional public service lines and secondary portals

Total weight
75
Coverage
54.4%
Residual risk
34.2 pts 45.6%
Layers drawn on
6 of 10
Assets carrying it
10 outright · 33 allocated
Heaviest dependency
T4 Applications and Workloads · weight 16

Public data services

Bulk data and open API surfaces

Total weight
66
Coverage
53.7%
Residual risk
30.6 pts 46.3%
Layers drawn on
5 of 10
Assets carrying it
6 outright · 29 allocated
Heaviest dependency
T4 Applications and Workloads · weight 20

Fee and financial operations

Fee, payment and financial data systems

Total weight
127
Coverage
52.2%
Residual risk
60.8 pts 47.8%
Layers drawn on
8 of 10
Assets carrying it
9 outright · 40 allocated
Heaviest dependency
T1 Identity · weight 25

Coverage does not separate these missions. Residual weight does.

The six coverage percentages run from 52.2% to 54.4% — a band of 2.2 points across the entire model. That looks like precision and is the opposite of it: average enough layers together and every mission converges on the estate’s mean maturity, because most missions draw on most layers. A briefing that ranks missions by coverage per cent is ranking them by rounding error.

Residual points do not converge. They run from 30.6 to 60.8 Fee and financial operations carries 1.99 times the exposed weight of Public data services, on coverage figures that are 1.5 points apart. That is the number to brief, and it is the number the model was built to produce: weight against gap, not gap alone.

Illustrative — the Federal Reference Agency profile, not an assessment of any real estate. The convergence, however, is structural rather than a property of these particular figures — it is what happens whenever a weighted mean is taken over many components, and it will happen to an adopter’s real numbers too.

Layer 0 · 46 assets

The Asset Register, Which Is the Part That Makes the Trace Run Backwards.

A bill can be produced without an asset register — the towers are enough. The second direction cannot: to pick an asset and see what it protects, there has to be an asset to pick. This register is that row, and its weights are the only scores authored on this page.

Each row declares the sub-tower it sits under, and inherits that sub-tower’s maturity as its coverage. Nothing here scores coverage independently, so the register cannot produce a figure that disagrees with the terrain reference. The whole register carries 755 weight points at 51.9% coverage, leaving 363.4 residual points — of which the heaviest single pool is Application assets at 76.

Exhibit 2

The 11 pools, rolled up from their own rows

  • Identity assets

    T1 Identity

    The identity plane and everything that holds a credential. The pool that is usually complete for humans and badly incomplete for the machines.

    • Assets5
    • Weight96
    • Coverage59.1%
    • Residual39.3

    Carries 6 of the 6 missions outright.

  • Device assets

    T2 Devices

    Everything that holds a session. Individually cheap to lose, which is why the register weights them on exposure rather than on what they are worth.

    • Assets4
    • Weight58
    • Coverage56.9%
    • Residual25

    Carries 4 of the 6 missions outright.

  • Network assets

    T3 Networks

    The corridors and the things that constrain them. The pool most likely to be complete on the diagram and stale in the register.

    • Assets5
    • Weight97
    • Coverage65.7%
    • Residual33.3

    Carries 6 of the 6 missions outright.

  • The systems a mission is actually delivered through, plus the pipeline that produces them — which is in the pool despite carrying no mission of its own.

    • Assets8
    • Weight152
    • Coverage50%
    • Residual76

    Carries 6 of the 6 missions outright.

  • Cloud workload assets

    T4 Applications and Workloads

    The substrate applications run on. Allocated into the same tower as the applications, because a runtime that admits an unsigned image is an application-layer failure.

    • Assets2
    • Weight31
    • Coverage50%
    • Residual15.5

    Carries no mission outright — every row in this pool reaches its missions by allocation.

  • Data assets

    T5 Data

    The holdings, and every copy of them. The copies are the part that gets left out, and they are the part with no access governance on them.

    • Assets6
    • Weight98
    • Coverage49.7%
    • Residual49.3

    Carries 6 of the 6 missions outright.

  • Operational technology assets

    T6 Operational Technology

    Plant and instrumentation on general-purpose networks. Procured by program offices, frequently absent from the security register entirely.

    • Assets3
    • Weight28
    • Coverage35.7%
    • Residual18

    Carries 1 of the 6 missions outright.

  • Workforce assets

    T7 Workforce

    Populations rather than machines. The only pool that is simultaneously the thing defended and the force defending it.

    • Assets4
    • Weight68
    • Coverage44.1%
    • Residual38

    Carries 2 of the 6 missions outright.

  • Facility assets

    T8 Facilities

    Physical space holding production. Weighted low on exposure and high on consequence, which is the inverse of most of the register.

    • Assets3
    • Weight34
    • Coverage38.2%
    • Residual21

    Carries 2 of the 6 missions outright.

  • Supply-chain assets

    T9 Supply Chain

    The lines of communication: who can reach production, what they ship, and the channel it arrives through.

    • Assets3
    • Weight56
    • Coverage42.9%
    • Residual32

    Carries no mission outright — every row in this pool reaches its missions by allocation.

  • Cross-cutting assets

    TX Cross-Cutting

    The enablers of movement. They allocate to no mission at all, and that fact is the sharpest limitation in this model.

    • Assets3
    • Weight37
    • Coverage56.8%
    • Residual16

    Carries no mission outright — every row in this pool reaches its missions by allocation.

The tower model names six pools, because it was written when the terrain was the five zero-trust pillars and the cross-cutting enablers. Each of the four terrain layers added since brought a pool with it — a supplier is not a network asset and a wiring closet is not a device — so the register carries 11. Applications and workloads is the one tower fed by two pools.
Exhibit 3

The register in full: 46 assets, each with the sub-tower it inherits coverage from

AssetPoolTower · sub-towerWeightCoverageResidualMissions it carries outright
A-01 ICAM identity provider and policy decision pointThe only row in the register that every mission depends on without exception. Criticality is 5 by construction; exposure is 5 because it fronts external-user self-service.Identity assetsT1 IdentityAuthorization / PDP25 5 × 550%12.5 pts
A-02 PKI and PIV credential serviceCarries the staff-facing missions only. Exposure is lower than the identity provider because it is not reachable from the public tier.Identity assetsT1 IdentityAuthentication (phishing-resistant MFA)15 5 × 375%3.8 pts
A-03 External-user account directoryCitizens, businesses, partners and their agents. Maximal exposure, and the population the agency has the least control over — no device management, no joiner-mover-leaver process, no training.Identity assetsT1 IdentityAuthentication (phishing-resistant MFA)20 4 × 575%5 pts
A-04 Privileged accounts and the access brokerNo mission stops if the broker stops — administration pauses. The weight is high anyway, because this is how the estate is operated and therefore how it would be operated against.Identity assetsT1 IdentityPrivileged Access (JIT/PAM)20 5 × 450%10 ptsNothing outright — allocated only.
A-05 Service and workload identitiesNon-person entities: service accounts, workload identities, pipeline credentials. Routinely over-permissioned and rarely recertified, because the governance process was built for humans.Identity assetsT1 IdentityIdentity Governance (ICAM)16 4 × 450%8 ptsNothing outright — allocated only.
A-06 Mission-staff laptopsLow criticality, maximal exposure — the inversion the device layer is built around. One laptop is worth little; it holds a live session to the tier where records are.Device assetsT2 DevicesDevice Compliance / Posture15 3 × 550%7.5 pts
A-07 Contractor and integrator endpointsManaged by somebody else, to a standard the agency reads about in a contract clause rather than in a posture signal.Device assetsT2 DevicesMobile & BYOD15 3 × 550%7.5 ptsNothing outright — allocated only.
A-08 Server and virtual-machine fleetThe estate that did not move to containers. Lower exposure than the endpoints, and considerably longer-lived, which is the same thing said twice.Device assetsT2 DevicesServer / Workload Hardening12 4 × 350%6 pts
A-09 Build agents and developer workstationsDevices with a route to the pipeline. Weighted as device assets, but their consequence is an application-layer consequence.Device assetsT2 DevicesEndpoint Protection (EDR)16 4 × 475%4 ptsNothing outright — allocated only.
A-10 TIC 3.0 access pointsEvery public-facing mission crosses here. Case processing does not appear, because its users are already inside — which is exactly why the boundary below matters more to it.Network assetsT3 NetworksPerimeter / TIC 3.025 5 × 575%6.3 pts
A-11 Edge delivery and volumetric scrubbingThe availability control for the missions where availability is a statutory property rather than a service target.Network assetsT3 NetworksWAF & DDoS20 4 × 575%5 pts
A-12 Web application firewall fronting the public tierShares a sub-tower with the scrubbing edge and therefore shares its coverage, which is a fair simplification and worth naming as one.Network assetsT3 NetworksWAF & DDoS16 4 × 475%4 pts
A-13 The public-tier / mission-tier boundaryThe decisive point on the network layer: the crossing an adversary who has taken a public service must make for the compromise to be worth anything.Network assetsT3 NetworksMicrosegmentation20 5 × 450%10 pts
A-14 Authoritative and recursive DNSThe second row every mission depends on. It is in the register for the resolution service, and it earns its weight twice over as the estate’s most under-read egress telemetry.Network assetsT3 NetworksEgress & DNS Control16 4 × 450%8 pts
A-15 The public service portalThe front door. Maximal on both axes, and the asset most likely to be tested by somebody the agency did not invite.Application assetsT4 Applications and WorkloadsAppSec (SAST / DAST)25 5 × 550%12.5 pts
A-16 The case filing front doorIntake and e-filing. The asset where an availability failure converts directly into a missed statutory receipt date.Application assetsT4 Applications and WorkloadsAPI Security25 5 × 550%12.5 pts
A-17 The case processing systemWhere records are worked. Lower exposure, because access is mediated internally — and the highest consequence in the register, because access here is access to records in volume.Application assetsT4 Applications and WorkloadsAppSec (SAST / DAST)15 5 × 350%7.5 pts
A-18 The administrative adjudication docketLower volume than case processing and a harder deadline, which is a different risk profile wearing the same technology.Application assetsT4 Applications and WorkloadsAppSec (SAST / DAST)12 4 × 350%6 pts
A-19 Secondary public service portalsDelivered by a different program on a different schedule. The exposure is the same as the primary portal; the attention is not.Application assetsT4 Applications and WorkloadsAppSec (SAST / DAST)15 3 × 550%7.5 pts
A-20 The public bulk data and open API surfaceConfidentiality is deliberately low here, so criticality reads low on a data-derived scale and the real exposure — enumeration and abuse at scale — sits in the integrity and availability columns nobody scores.Application assetsT4 Applications and WorkloadsAPI Security15 3 × 550%7.5 pts
A-21 The fee and payment applicationThe only asset in the register facing a sustained, financially motivated adversary as well as a nation-state one.Application assetsT4 Applications and WorkloadsAPI Security25 5 × 550%12.5 pts
A-22 The CI/CD pipelineThe decisive point on the application layer, and it carries no mission. An availability-derived register would rate this asset near zero, which is the precise reason the model weights criticality by consequence rather than by outage.Application assetsT4 Applications and WorkloadsPipeline Security (CI/CD)20 5 × 450%10 ptsNothing outright — allocated only.
A-23 Container platform and orchestrationCarries no mission by name and hosts most of them. The admission point is where an unsigned or over-privileged image is either stopped or not.Cloud workload assetsT4 Applications and WorkloadsRuntime & Container16 4 × 450%8 ptsNothing outright — allocated only.
A-24 Secrets store for workload credentialsHolds the credentials the non-person identities present. Compromise here is an identity-layer event that the register files under cloud, which is a seam worth knowing about.Cloud workload assetsT4 Applications and WorkloadsRuntime & Container15 5 × 350%7.5 ptsNothing outright — allocated only.
A-25 Sensitive mission recordsThe crown jewels: pre-decisional, non-public, and the holding whose loss is least reversible. Every other row in this register exists to keep somebody off this one.Data assetsT5 DataData Access Governance20 5 × 450%10 pts
A-26 The external-user PII storeThe privacy exposure. Its criticality comes from the obligation attached to it rather than from the mission value of the records.Data assetsT5 DataClassification20 5 × 450%10 pts
A-27 The fee and financial databaseThe accounting record. Integrity dominates: a quietly altered ledger is worse than a stolen one, and far harder to notice.Data assetsT5 DataEncryption & Key Management15 5 × 375%3.8 pts
A-28 Published bulk-data extractsDeliberately public. The classification sub-tower carries it because the risk is an extract containing more than the dissemination decision authorized.Data assetsT5 DataClassification15 3 × 550%7.5 pts
A-29 Audit and telemetry record storesThe evidence base for every claim on this site. It carries no mission and it is the first thing an adversary edits.Data assetsT5 DataData Access Governance12 4 × 350%6 ptsNothing outright — allocated only.
A-30 Analytic and non-production copies of mission dataThe copies. Same records, a fraction of the governance, and almost never in the authorization boundary that was assessed.Data assetsT5 DataDLP16 4 × 425%12 ptsNothing outright — allocated only.
A-31 Building control and physical access systemsHolds no data and can stop a data center. A consequence model derived from records exposed scores this at 1; doctrine scores it at 4.Operational technology assetsT6 Operational TechnologyOT / IT Boundary12 4 × 350%6 ptsNothing outright — allocated only.
A-32 Public-counter and laboratory instrumentationMission-supporting equipment on a general-purpose network. It carries a mission that does not draw on the operational-technology layer at all — the one place in this register where the two directions of the trace disagree, and it is left visible rather than tidied away.Operational technology assetsT6 Operational TechnologyOT Asset Inventory8 2 × 425%6 pts
A-33 Engineering workstations for facility systemsThe crossing point between the two estates, operated by people whose profession is availability rather than confidentiality.Operational technology assetsT6 Operational TechnologyEngineering Access8 4 × 225%6 ptsNothing outright — allocated only.
A-34 The privileged administrator populationA population, not a machine. Weighted at the top of the register because the question "who holds privilege today" is the one most estates answer from memory.Workforce assetsT7 WorkforcePrivileged Human Register20 5 × 450%10 ptsNothing outright — allocated only.
A-35 Mission staff with volume record accessIndividually low-privilege, collectively the crown-jewel access path. The only workforce row that carries a mission directly, because these are the people the mission is performed by.Workforce assetsT7 WorkforceInsider Risk Position16 4 × 425%12 pts
A-36 Contractor and vendor staff with production accessThe population whose departures the agency learns about last, which is why the sub-tower is separation tempo rather than headcount.Workforce assetsT7 WorkforceSeparation Tempo20 4 × 550%10 ptsNothing outright — allocated only.
A-37 The defending team itselfTerrain that is also the force. A saturated team is a coverage problem on every other row in this register simultaneously.Workforce assetsT7 WorkforceRole-Based Readiness12 4 × 350%6 ptsNothing outright — allocated only.
A-38 Primary data center and equipment roomsLow exposure, maximal consequence — the inverse of the endpoint rows, and the reason a purely logical model mis-scores it.Facility assetsT8 FacilitiesPhysical Zone Boundary10 5 × 250%5 pts
A-39 Environmental plant serving productionCooling and power. It fails in the order it happens to fail rather than in the order the mission would choose, unless somebody has said otherwise in advance.Facility assetsT8 FacilitiesEnvironmental Continuity8 4 × 250%4 ptsNothing outright — allocated only.
A-40 Vendor maintenance routes into production spacePhysical access granted on a work order. The highest-exposure facility row, and the one least likely to appear on a network diagram.Facility assetsT8 FacilitiesMaintenance Access16 4 × 425%12 ptsNothing outright — allocated only.
A-41 Managed service providers with production accessStanding access held by an organization the agency does not operate. Carries no mission and can reach most of them.Supply-chain assetsT9 Supply ChainAccess Constraint20 4 × 550%10 ptsNothing outright — allocated only.
A-42 Third-party components in mission applicationsThe dependency tree. The register row that a national advisory arrives about, on a clock, expecting an inventory answer.Supply-chain assetsT9 Supply ChainComponent Provenance16 4 × 425%12 ptsNothing outright — allocated only.
A-43 Vendor update channels into the estateThe route a trusted change arrives by, which is the route an untrusted one arrives by. Doctrinally this is a line of communication, and it is defended like logistics.Supply-chain assetsT9 Supply ChainUpdate Staging20 5 × 450%10 ptsNothing outright — allocated only.
A-44 The telemetry and analytics platformReconnaissance. Every detection claim on this site is downstream of it, and no mission draws on the layer it sits on.Cross-cutting assetsTX Cross-CuttingVisibility & Analytics (ISR)15 5 × 350%7.5 ptsNothing outright — allocated only.
A-45 Orchestration and response toolingMobility. It converts a decision into an action inside the adversary’s decision window, or it does not and the coverage figures above are theoretical.Cross-cutting assetsTX Cross-CuttingAutomation & Orchestration (mobility)12 4 × 350%6 ptsNothing outright — allocated only.
A-46 The rules of engagement and the cycle recordCommand authority as an asset. Without a standing authorization to act, every maneuver in the catalog is a proposal.Cross-cutting assetsTX Cross-CuttingGovernance (command authority)10 5 × 275%2.5 ptsNothing outright — allocated only.

A-01 ICAM identity provider and policy decision point

The only row in the register that every mission depends on without exception. Criticality is 5 by construction; exposure is 5 because it fronts external-user self-service.

Pool
Identity assets
Tower · sub-tower
T1 IdentityAuthorization / PDP
Weight
25 5 × 5
Coverage
50%
Residual
12.5 pts

A-02 PKI and PIV credential service

Carries the staff-facing missions only. Exposure is lower than the identity provider because it is not reachable from the public tier.

Pool
Identity assets
Tower · sub-tower
T1 IdentityAuthentication (phishing-resistant MFA)
Weight
15 5 × 3
Coverage
75%
Residual
3.8 pts

A-03 External-user account directory

Citizens, businesses, partners and their agents. Maximal exposure, and the population the agency has the least control over — no device management, no joiner-mover-leaver process, no training.

Pool
Identity assets
Tower · sub-tower
T1 IdentityAuthentication (phishing-resistant MFA)
Weight
20 4 × 5
Coverage
75%
Residual
5 pts

A-04 Privileged accounts and the access broker

No mission stops if the broker stops — administration pauses. The weight is high anyway, because this is how the estate is operated and therefore how it would be operated against.

Pool
Identity assets
Tower · sub-tower
T1 IdentityPrivileged Access (JIT/PAM)
Weight
20 5 × 4
Coverage
50%
Residual
10 pts
Missions it carries outright
Nothing outright — allocated only.

A-05 Service and workload identities

Non-person entities: service accounts, workload identities, pipeline credentials. Routinely over-permissioned and rarely recertified, because the governance process was built for humans.

Pool
Identity assets
Tower · sub-tower
T1 IdentityIdentity Governance (ICAM)
Weight
16 4 × 4
Coverage
50%
Residual
8 pts
Missions it carries outright
Nothing outright — allocated only.

A-06 Mission-staff laptops

Low criticality, maximal exposure — the inversion the device layer is built around. One laptop is worth little; it holds a live session to the tier where records are.

Pool
Device assets
Tower · sub-tower
T2 DevicesDevice Compliance / Posture
Weight
15 3 × 5
Coverage
50%
Residual
7.5 pts

A-07 Contractor and integrator endpoints

Managed by somebody else, to a standard the agency reads about in a contract clause rather than in a posture signal.

Pool
Device assets
Tower · sub-tower
T2 DevicesMobile & BYOD
Weight
15 3 × 5
Coverage
50%
Residual
7.5 pts
Missions it carries outright
Nothing outright — allocated only.

A-08 Server and virtual-machine fleet

The estate that did not move to containers. Lower exposure than the endpoints, and considerably longer-lived, which is the same thing said twice.

Pool
Device assets
Tower · sub-tower
T2 DevicesServer / Workload Hardening
Weight
12 4 × 3
Coverage
50%
Residual
6 pts
Missions it carries outright

A-09 Build agents and developer workstations

Devices with a route to the pipeline. Weighted as device assets, but their consequence is an application-layer consequence.

Pool
Device assets
Tower · sub-tower
T2 DevicesEndpoint Protection (EDR)
Weight
16 4 × 4
Coverage
75%
Residual
4 pts
Missions it carries outright
Nothing outright — allocated only.

A-10 TIC 3.0 access points

Every public-facing mission crosses here. Case processing does not appear, because its users are already inside — which is exactly why the boundary below matters more to it.

Pool
Network assets
Tower · sub-tower
T3 NetworksPerimeter / TIC 3.0
Weight
25 5 × 5
Coverage
75%
Residual
6.3 pts

A-11 Edge delivery and volumetric scrubbing

The availability control for the missions where availability is a statutory property rather than a service target.

Pool
Network assets
Tower · sub-tower
T3 NetworksWAF & DDoS
Weight
20 4 × 5
Coverage
75%
Residual
5 pts
Missions it carries outright

A-12 Web application firewall fronting the public tier

Shares a sub-tower with the scrubbing edge and therefore shares its coverage, which is a fair simplification and worth naming as one.

Pool
Network assets
Tower · sub-tower
T3 NetworksWAF & DDoS
Weight
16 4 × 4
Coverage
75%
Residual
4 pts

A-13 The public-tier / mission-tier boundary

The decisive point on the network layer: the crossing an adversary who has taken a public service must make for the compromise to be worth anything.

Pool
Network assets
Tower · sub-tower
T3 NetworksMicrosegmentation
Weight
20 5 × 4
Coverage
50%
Residual
10 pts
Missions it carries outright

A-14 Authoritative and recursive DNS

The second row every mission depends on. It is in the register for the resolution service, and it earns its weight twice over as the estate’s most under-read egress telemetry.

Pool
Network assets
Tower · sub-tower
T3 NetworksEgress & DNS Control
Weight
16 4 × 4
Coverage
50%
Residual
8 pts

A-15 The public service portal

The front door. Maximal on both axes, and the asset most likely to be tested by somebody the agency did not invite.

Pool
Application assets
Tower · sub-tower
T4 Applications and WorkloadsAppSec (SAST / DAST)
Weight
25 5 × 5
Coverage
50%
Residual
12.5 pts
Missions it carries outright

A-16 The case filing front door

Intake and e-filing. The asset where an availability failure converts directly into a missed statutory receipt date.

Pool
Application assets
Tower · sub-tower
T4 Applications and WorkloadsAPI Security
Weight
25 5 × 5
Coverage
50%
Residual
12.5 pts
Missions it carries outright

A-17 The case processing system

Where records are worked. Lower exposure, because access is mediated internally — and the highest consequence in the register, because access here is access to records in volume.

Pool
Application assets
Tower · sub-tower
T4 Applications and WorkloadsAppSec (SAST / DAST)
Weight
15 5 × 3
Coverage
50%
Residual
7.5 pts
Missions it carries outright

A-18 The administrative adjudication docket

Lower volume than case processing and a harder deadline, which is a different risk profile wearing the same technology.

Pool
Application assets
Tower · sub-tower
T4 Applications and WorkloadsAppSec (SAST / DAST)
Weight
12 4 × 3
Coverage
50%
Residual
6 pts
Missions it carries outright

A-19 Secondary public service portals

Delivered by a different program on a different schedule. The exposure is the same as the primary portal; the attention is not.

Pool
Application assets
Tower · sub-tower
T4 Applications and WorkloadsAppSec (SAST / DAST)
Weight
15 3 × 5
Coverage
50%
Residual
7.5 pts
Missions it carries outright

A-20 The public bulk data and open API surface

Confidentiality is deliberately low here, so criticality reads low on a data-derived scale and the real exposure — enumeration and abuse at scale — sits in the integrity and availability columns nobody scores.

Pool
Application assets
Tower · sub-tower
T4 Applications and WorkloadsAPI Security
Weight
15 3 × 5
Coverage
50%
Residual
7.5 pts
Missions it carries outright

A-21 The fee and payment application

The only asset in the register facing a sustained, financially motivated adversary as well as a nation-state one.

Pool
Application assets
Tower · sub-tower
T4 Applications and WorkloadsAPI Security
Weight
25 5 × 5
Coverage
50%
Residual
12.5 pts
Missions it carries outright

A-22 The CI/CD pipeline

The decisive point on the application layer, and it carries no mission. An availability-derived register would rate this asset near zero, which is the precise reason the model weights criticality by consequence rather than by outage.

Pool
Application assets
Tower · sub-tower
T4 Applications and WorkloadsPipeline Security (CI/CD)
Weight
20 5 × 4
Coverage
50%
Residual
10 pts
Missions it carries outright
Nothing outright — allocated only.

A-23 Container platform and orchestration

Carries no mission by name and hosts most of them. The admission point is where an unsigned or over-privileged image is either stopped or not.

Pool
Cloud workload assets
Tower · sub-tower
T4 Applications and WorkloadsRuntime & Container
Weight
16 4 × 4
Coverage
50%
Residual
8 pts
Missions it carries outright
Nothing outright — allocated only.

A-24 Secrets store for workload credentials

Holds the credentials the non-person identities present. Compromise here is an identity-layer event that the register files under cloud, which is a seam worth knowing about.

Pool
Cloud workload assets
Tower · sub-tower
T4 Applications and WorkloadsRuntime & Container
Weight
15 5 × 3
Coverage
50%
Residual
7.5 pts
Missions it carries outright
Nothing outright — allocated only.

A-25 Sensitive mission records

The crown jewels: pre-decisional, non-public, and the holding whose loss is least reversible. Every other row in this register exists to keep somebody off this one.

Pool
Data assets
Tower · sub-tower
T5 DataData Access Governance
Weight
20 5 × 4
Coverage
50%
Residual
10 pts
Missions it carries outright

A-26 The external-user PII store

The privacy exposure. Its criticality comes from the obligation attached to it rather than from the mission value of the records.

Pool
Data assets
Tower · sub-tower
T5 DataClassification
Weight
20 5 × 4
Coverage
50%
Residual
10 pts

A-27 The fee and financial database

The accounting record. Integrity dominates: a quietly altered ledger is worse than a stolen one, and far harder to notice.

Pool
Data assets
Tower · sub-tower
T5 DataEncryption & Key Management
Weight
15 5 × 3
Coverage
75%
Residual
3.8 pts
Missions it carries outright

A-28 Published bulk-data extracts

Deliberately public. The classification sub-tower carries it because the risk is an extract containing more than the dissemination decision authorized.

Pool
Data assets
Tower · sub-tower
T5 DataClassification
Weight
15 3 × 5
Coverage
50%
Residual
7.5 pts
Missions it carries outright

A-29 Audit and telemetry record stores

The evidence base for every claim on this site. It carries no mission and it is the first thing an adversary edits.

Pool
Data assets
Tower · sub-tower
T5 DataData Access Governance
Weight
12 4 × 3
Coverage
50%
Residual
6 pts
Missions it carries outright
Nothing outright — allocated only.

A-30 Analytic and non-production copies of mission data

The copies. Same records, a fraction of the governance, and almost never in the authorization boundary that was assessed.

Pool
Data assets
Tower · sub-tower
T5 DataDLP
Weight
16 4 × 4
Coverage
25%
Residual
12 pts
Missions it carries outright
Nothing outright — allocated only.

A-31 Building control and physical access systems

Holds no data and can stop a data center. A consequence model derived from records exposed scores this at 1; doctrine scores it at 4.

Pool
Operational technology assets
Tower · sub-tower
T6 Operational TechnologyOT / IT Boundary
Weight
12 4 × 3
Coverage
50%
Residual
6 pts
Missions it carries outright
Nothing outright — allocated only.

A-32 Public-counter and laboratory instrumentation

Mission-supporting equipment on a general-purpose network. It carries a mission that does not draw on the operational-technology layer at all — the one place in this register where the two directions of the trace disagree, and it is left visible rather than tidied away.

Pool
Operational technology assets
Tower · sub-tower
T6 Operational TechnologyOT Asset Inventory
Weight
8 2 × 4
Coverage
25%
Residual
6 pts
Missions it carries outright

A-33 Engineering workstations for facility systems

The crossing point between the two estates, operated by people whose profession is availability rather than confidentiality.

Pool
Operational technology assets
Tower · sub-tower
T6 Operational TechnologyEngineering Access
Weight
8 4 × 2
Coverage
25%
Residual
6 pts
Missions it carries outright
Nothing outright — allocated only.

A-34 The privileged administrator population

A population, not a machine. Weighted at the top of the register because the question "who holds privilege today" is the one most estates answer from memory.

Pool
Workforce assets
Tower · sub-tower
T7 WorkforcePrivileged Human Register
Weight
20 5 × 4
Coverage
50%
Residual
10 pts
Missions it carries outright
Nothing outright — allocated only.

A-35 Mission staff with volume record access

Individually low-privilege, collectively the crown-jewel access path. The only workforce row that carries a mission directly, because these are the people the mission is performed by.

Pool
Workforce assets
Tower · sub-tower
T7 WorkforceInsider Risk Position
Weight
16 4 × 4
Coverage
25%
Residual
12 pts
Missions it carries outright

A-36 Contractor and vendor staff with production access

The population whose departures the agency learns about last, which is why the sub-tower is separation tempo rather than headcount.

Pool
Workforce assets
Tower · sub-tower
T7 WorkforceSeparation Tempo
Weight
20 4 × 5
Coverage
50%
Residual
10 pts
Missions it carries outright
Nothing outright — allocated only.

A-37 The defending team itself

Terrain that is also the force. A saturated team is a coverage problem on every other row in this register simultaneously.

Pool
Workforce assets
Tower · sub-tower
T7 WorkforceRole-Based Readiness
Weight
12 4 × 3
Coverage
50%
Residual
6 pts
Missions it carries outright
Nothing outright — allocated only.

A-38 Primary data center and equipment rooms

Low exposure, maximal consequence — the inverse of the endpoint rows, and the reason a purely logical model mis-scores it.

Pool
Facility assets
Tower · sub-tower
T8 FacilitiesPhysical Zone Boundary
Weight
10 5 × 2
Coverage
50%
Residual
5 pts
Missions it carries outright

A-39 Environmental plant serving production

Cooling and power. It fails in the order it happens to fail rather than in the order the mission would choose, unless somebody has said otherwise in advance.

Pool
Facility assets
Tower · sub-tower
T8 FacilitiesEnvironmental Continuity
Weight
8 4 × 2
Coverage
50%
Residual
4 pts
Missions it carries outright
Nothing outright — allocated only.

A-40 Vendor maintenance routes into production space

Physical access granted on a work order. The highest-exposure facility row, and the one least likely to appear on a network diagram.

Pool
Facility assets
Tower · sub-tower
T8 FacilitiesMaintenance Access
Weight
16 4 × 4
Coverage
25%
Residual
12 pts
Missions it carries outright
Nothing outright — allocated only.

A-41 Managed service providers with production access

Standing access held by an organization the agency does not operate. Carries no mission and can reach most of them.

Pool
Supply-chain assets
Tower · sub-tower
T9 Supply ChainAccess Constraint
Weight
20 4 × 5
Coverage
50%
Residual
10 pts
Missions it carries outright
Nothing outright — allocated only.

A-42 Third-party components in mission applications

The dependency tree. The register row that a national advisory arrives about, on a clock, expecting an inventory answer.

Pool
Supply-chain assets
Tower · sub-tower
T9 Supply ChainComponent Provenance
Weight
16 4 × 4
Coverage
25%
Residual
12 pts
Missions it carries outright
Nothing outright — allocated only.

A-43 Vendor update channels into the estate

The route a trusted change arrives by, which is the route an untrusted one arrives by. Doctrinally this is a line of communication, and it is defended like logistics.

Pool
Supply-chain assets
Tower · sub-tower
T9 Supply ChainUpdate Staging
Weight
20 5 × 4
Coverage
50%
Residual
10 pts
Missions it carries outright
Nothing outright — allocated only.

A-44 The telemetry and analytics platform

Reconnaissance. Every detection claim on this site is downstream of it, and no mission draws on the layer it sits on.

Pool
Cross-cutting assets
Tower · sub-tower
TX Cross-CuttingVisibility & Analytics (ISR)
Weight
15 5 × 3
Coverage
50%
Residual
7.5 pts
Missions it carries outright
Nothing outright — allocated only.

A-45 Orchestration and response tooling

Mobility. It converts a decision into an action inside the adversary’s decision window, or it does not and the coverage figures above are theoretical.

Pool
Cross-cutting assets
Tower · sub-tower
TX Cross-CuttingAutomation & Orchestration (mobility)
Weight
12 4 × 3
Coverage
50%
Residual
6 pts
Missions it carries outright
Nothing outright — allocated only.

A-46 The rules of engagement and the cycle record

Command authority as an asset. Without a standing authorization to act, every maneuver in the catalog is a proposal.

Pool
Cross-cutting assets
Tower · sub-tower
TX Cross-CuttingGovernance (command authority)
Weight
10 5 × 2
Coverage
75%
Residual
2.5 pts
Missions it carries outright
Nothing outright — allocated only.
Illustrative — the Federal Reference Agency profile, not an assessment of any real estate. “Carries outright” is a deliberately narrow relation: the mission stops if this asset stops. It is not “is relevant to”. 22 of the 46 rows carry nothing under that test, and that is the honest answer rather than a gap in the authoring — those assets reach their missions by allocation, which the next section does in full.
The Bills of Defense

Each Mission, Written Out in Full.

What it delivers, what obligation it is exposed on, the terrain it draws from, the assets that carry it, the controls in scope, the maneuvers reaching it, what recovery has to demonstrate — and then the bill, with the arithmetic shown rather than summarized.

01

Public service delivery

The public service portal and external-user accounts

  • Weight118
  • Coverage53.7%
  • Residual54.7 pts
  • Illustrative

Draws most heavily on identity and applications because its user population is external and its surface is public. Device weight is low: it does not control the endpoints its users arrive on, which is itself the finding.

What it delivers

The front door. Account creation, submission, status, correspondence and payment initiation for the agency’s primary public service line — the surface most people mean when they say they have dealt with the agency.

It is also the intake path for the mission that follows it: what is filed here becomes the work that case processing does, so an availability failure at the front door is a workload failure downstream three weeks later.

Consumed by Members of the public, businesses and their representatives, arriving on devices the agency does not manage.

Statutory or service-level exposure

Statutory receipt date and a published service commitment

The obligation
Anything submitted through the portal acquires a receipt date, and rights attach to it. The agency also publishes a service commitment for availability and response, which is a promise rather than a statute but is read as one by everybody who relies on it.
The clock
The submission clock, which the agency does not control. A filing accepted at 23:58 on a due date is timely; one the portal refuses at 23:58 is not, and no amount of subsequent uptime repairs it.
What it costs when it is missed
Members of the public who did nothing wrong lose a date. The agency absorbs the correction as a manual intake process it has to staff, plus a class of appeals it did not budget for, plus the public account of the outage.
The availability floor · FO-5
The availability floor is the deadline calendar, not a percentage. Peaks around statutory dates are the hours that matter, and a defensive action that takes the portal down during one has traded the mission to protect it.
Recovery objectives Illustrative
  • RTO4 hours
  • RPO15 minutes
  • MTD24 hours
What an exercise has to demonstrate · RC-5
A restore that stands up the portal and the account directory from copies held outside the production identity plane, with the identity plane itself rebuilt first, and proves the restored submissions against an independent receipt record rather than against the application’s own database.
The part that actually fails
The receipt record. Restoring the portal is a platform exercise; proving that every submission accepted in the fifteen minutes before the event is either present or accounted for is an evidence exercise, and it is the one that has never been run.

Objectives are declared per mission service under RC-1, restored on a path that does not depend on the production identity plane (RC-3), and verified against an independent integrity record (RC-4). The form of maneuver is M11 Reconstitution, whose indicator is that every objective has been demonstrated within its stated period — not that one exists.

The Bill of Defense · 7 of 10 layers
  • T1IdentityWeight25Share21.2%Layer coverage58.1%Residual10.5 pts
  • T4Applications and WorkloadsWeight25Share21.2%Layer coverage50%Residual12.5 pts
  • T3NetworksWeight20Share16.9%Layer coverage63.2%Residual7.4 pts
  • T5DataWeight20Share16.9%Layer coverage49.6%Residual10.1 pts
  • T9Supply ChainWeight12Share10.2%Layer coverage44.4%Residual6.7 pts
  • T2DevicesWeight10Share8.5%Layer coverage57.9%Residual4.2 pts
  • T7WorkforceWeight6Share5.1%Layer coverage44.9%Residual3.3 pts
  • Rolled upWeight118Share100%Coverage53.7%Residual54.7 pts · 46.3%

Layers absent from this list contribute nothing to the bill because the mission declares no draw on them: T6 Operational Technology, T8 Facilities, TX Cross-Cutting. Absence is a declaration, not an oversight — and it is where the trace below finds what the bill cannot see.

Assets that carry it · 9 outright

A further 28 assets are allocated to this mission without stopping it, carrying 129.7 allocated weight points in total. The full split is in the trace.

Controls in scope · 59

Derived from the layers this mission draws on, not authored against the mission. Nine act on the terrain model itself and therefore apply to every layer by construction; the remaining 42 are named by one or more of the 7 layers in the bill above, for reasons those layers give themselves.

Maneuvers defending it

Ranked by reach: the share of this mission’s weight that sits on layers where the form actually has cataloged techniques. Selecting forms by their declared primary terrain returns all 11 for all 6 missions and differentiates nothing, so the ranking is derived from the technique catalog’s own terrain declarations instead.

Main effort · SM-4

M3 Envelopment44.9% reach

The adversary’s plan runs through a credential belonging to somebody the agency cannot manage, train or issue a device to. Every other form in the sequence is buying time for the envelopment to hold.

The widest-reaching form here is M1 Screen / Guard at 100%, and the main effort is M3 anyway. Reach is breadth; main effort is concentration. A form that touches every layer a mission stands on is not thereby the place to mass — that is a claim about where the adversary’s plan is decided, and it is a commander’s judgment rather than an output of this table.

What this bill hidesThe device weight is the lowest of the six, and that is not a finding about risk — it is a finding about control. The mission’s users arrive on endpoints the agency has no posture signal for, so the layer that would carry that risk is scored light because there is nothing to score. The bill reads as though devices barely matter to this mission; what it means is that devices are somebody else’s.

02

Case processing and adjudication

The case processing system and mission-staff workflow

  • Weight127
  • Coverage52.4%
  • Residual60.5 pts
  • Illustrative

The mission with the heaviest data dependency, and the only one whose workforce weight is comparable to its network weight — its staff hold volume access to the crown-jewel record set.

What it delivers

The work itself. Examination, analysis, correspondence and decision on the case load the filing front door produces, performed by staff who hold volume access to the record set the whole estate exists to protect.

It is the mission with the heaviest data dependency in the model, and the only one whose workforce weight is comparable to its network weight, for the same reason: the people performing it are an access path.

Consumed by Mission staff working cases, and — at one remove, on a pendency clock — everybody waiting on one.

Statutory or service-level exposure

Statutory processing timelines and privacy obligations over a system of records

The obligation
Processing timelines the agency reports against, and privacy obligations attaching to a record set that is largely pre-decisional and non-public. The reporting obligation makes pendency a public number, which changes how an outage is experienced politically.
The clock
The pendency clock, which does not stop for an incident. A week of degraded processing is a week added to every case in the queue and a number the agency will publish.
What it costs when it is missed
Backlog, compounding. Unlike a missed filing date, this failure has no single victim and no single remedy — it is absorbed by everybody in the queue and cleared over quarters, at overtime rates.
The availability floor · FO-5
The floor is throughput rather than uptime. Isolation that keeps the system running at a third of capacity may be the correct defensive trade; isolation that stops it during a reporting period is not.
Recovery objectives Illustrative
  • RTO12 hours
  • RPO1 hour
  • MTD72 hours
What an exercise has to demonstrate · RC-5
A rebuild of the case processing system on a trusted path, with the record set restored and verified against an independent integrity record, and a demonstration that in-flight work — the drafts and partial decisions that live nowhere else — is either recovered or provably lost so the queue can be re-worked deliberately.
The part that actually fails
In-flight work. The record store restores; the half-finished analysis in a staff member’s working session does not, and no recovery objective in any agency’s plan has ever named it.

Objectives are declared per mission service under RC-1, restored on a path that does not depend on the production identity plane (RC-3), and verified against an independent integrity record (RC-4). The form of maneuver is M11 Reconstitution, whose indicator is that every objective has been demonstrated within its stated period — not that one exists.

The Bill of Defense · 8 of 10 layers
  • T5DataWeight25Share19.7%Layer coverage49.6%Residual12.6 pts
  • T1IdentityWeight20Share15.7%Layer coverage58.1%Residual8.4 pts
  • T4Applications and WorkloadsWeight20Share15.7%Layer coverage50%Residual10 pts
  • T2DevicesWeight16Share12.6%Layer coverage57.9%Residual6.7 pts
  • T3NetworksWeight16Share12.6%Layer coverage63.2%Residual5.9 pts
  • T7WorkforceWeight15Share11.8%Layer coverage44.9%Residual8.3 pts
  • T9Supply ChainWeight9Share7.1%Layer coverage44.4%Residual5 pts
  • T8FacilitiesWeight6Share4.7%Layer coverage40.5%Residual3.6 pts
  • Rolled upWeight127Share100%Coverage52.4%Residual60.5 pts · 47.6%

Layers absent from this list contribute nothing to the bill because the mission declares no draw on them: T6 Operational Technology, TX Cross-Cutting. Absence is a declaration, not an oversight — and it is where the trace below finds what the bill cannot see.

Assets that carry it · 10 outright

A further 30 assets are allocated to this mission without stopping it, carrying 149.7 allocated weight points in total. The full split is in the trace.

Controls in scope · 64

Derived from the layers this mission draws on, not authored against the mission. Nine act on the terrain model itself and therefore apply to every layer by construction; the remaining 47 are named by one or more of the 8 layers in the bill above, for reasons those layers give themselves.

Maneuvers defending it

Ranked by reach: the share of this mission’s weight that sits on layers where the form actually has cataloged techniques. Selecting forms by their declared primary terrain returns all 11 for all 6 missions and differentiates nothing, so the ranking is derived from the technique catalog’s own terrain declarations instead.

Main effort · SM-4

M5 Ambush92.9% reach

Identity envelopment is assumed as the base, not the differentiator: the access that matters here looks authorized, because it is. The decisive move is seeding the record set so that volume access to it produces a detection with no false-positive budget.

The widest-reaching form here is M1 Screen / Guard at 100%, and the main effort is M5 anyway. Reach is breadth; main effort is concentration. A form that touches every layer a mission stands on is not thereby the place to mass — that is a claim about where the adversary’s plan is decided, and it is a commander’s judgment rather than an output of this table.

What this bill hidesThis bill carries the heaviest weight and the lowest coverage in the model, which reads as the worst answer of the six. It is not — it is the most honestly scored, because the layers this mission depends on are the ones the reference profile assessed carefully. A mission whose bill looks better may simply be drawing on layers nobody has looked at.

03

Administrative adjudication

The administrative adjudication and e-filing systems

  • Weight98
  • Coverage53.2%
  • Residual45.9 pts
  • Illustrative

Similar in shape to case processing at lower volume, with a heavier statutory-deadline constraint that makes availability a security property rather than a service target.

What it delivers

Docketing, filing, scheduling and decision issuance for administrative proceedings — lower volume than case processing, and a considerably harder clock, because a hearing date is a commitment to a person who has arranged their life around it.

Similar in technology to case processing and different in obligation: the due-process character of the proceeding makes availability a property of fairness rather than of service quality.

Consumed by Parties to a proceeding, their representatives, and the adjudicators hearing it.

Statutory or service-level exposure

Due-process obligations and deadlines set by regulation

The obligation
Filing windows, response periods and hearing dates fixed by regulation, with due-process obligations to the parties over the top of them. The record of the proceeding is itself the thing being protected — integrity failures here are not data-loss events, they are challenges to the decision.
The clock
A filing window that closes on a stated date, and a hearing calendar set months ahead. Both are visible to the parties, so a failure is contemporaneously documented by the people it happened to.
What it costs when it is missed
Continuances, and challenges to decisions issued on a record the agency cannot fully attest to. The cost is not throughput; it is the reviewability of the outcome.
The availability floor · FO-5
The floor is the filing window and the hearing calendar. Availability may be traded on any other day and may not be traded on those, which is a constraint a generic percentage-based availability target cannot express.
Recovery objectives Illustrative
  • RTO8 hours
  • RPO30 minutes
  • MTD48 hours
What an exercise has to demonstrate · RC-5
Restoration of the docket with its ordering and timestamps intact and independently verifiable, because a docket whose sequence cannot be attested is not a docket. The exercise has to prove the order, not merely the contents.
The part that actually fails
Timestamp provenance. Most restores prove that the records are present; proving when each one arrived, from a source other than the system that lost them, is a different capability and one almost nobody has built.

Objectives are declared per mission service under RC-1, restored on a path that does not depend on the production identity plane (RC-3), and verified against an independent integrity record (RC-4). The form of maneuver is M11 Reconstitution, whose indicator is that every objective has been demonstrated within its stated period — not that one exists.

The Bill of Defense · 7 of 10 layers
  • T1IdentityWeight20Share20.4%Layer coverage58.1%Residual8.4 pts
  • T5DataWeight20Share20.4%Layer coverage49.6%Residual10.1 pts
  • T4Applications and WorkloadsWeight16Share16.3%Layer coverage50%Residual8 pts
  • T2DevicesWeight12Share12.2%Layer coverage57.9%Residual5.1 pts
  • T3NetworksWeight12Share12.2%Layer coverage63.2%Residual4.4 pts
  • T7WorkforceWeight12Share12.2%Layer coverage44.9%Residual6.6 pts
  • T9Supply ChainWeight6Share6.1%Layer coverage44.4%Residual3.3 pts
  • Rolled upWeight98Share100%Coverage53.2%Residual45.9 pts · 46.8%

Layers absent from this list contribute nothing to the bill because the mission declares no draw on them: T6 Operational Technology, T8 Facilities, TX Cross-Cutting. Absence is a declaration, not an oversight — and it is where the trace below finds what the bill cannot see.

Assets that carry it · 12 outright

A further 25 assets are allocated to this mission without stopping it, carrying 106.5 allocated weight points in total. The full split is in the trace.

Controls in scope · 59

Derived from the layers this mission draws on, not authored against the mission. Nine act on the terrain model itself and therefore apply to every layer by construction; the remaining 42 are named by one or more of the 7 layers in the bill above, for reasons those layers give themselves.

Maneuvers defending it

Ranked by reach: the share of this mission’s weight that sits on layers where the form actually has cataloged techniques. Selecting forms by their declared primary terrain returns all 11 for all 6 missions and differentiates nothing, so the ranking is derived from the technique catalog’s own terrain declarations instead.

Main effort · SM-4

M8 Isolation / Retrograde100% reach

The whole problem is containing an intrusion without taking a proceeding off the calendar. This is the mission where giving ground deliberately — degrading in the order the mission dictates rather than the order the incident dictates — is the decisive skill.

The widest-reaching form here is M1 Screen / Guard at 100%, and the main effort is M8 anyway. Reach is breadth; main effort is concentration. A form that touches every layer a mission stands on is not thereby the place to mass — that is a claim about where the adversary’s plan is decided, and it is a commander’s judgment rather than an output of this table.

What this bill hidesThe bill is a scaled-down copy of case processing, and that similarity is the risk. The two missions share a technology stack and differ in obligation, so a control decision justified by case processing’s throughput floor can be silently applied here, where the floor is a fixed date and the trade is not available.

04

Secondary public service

Additional public service lines and secondary portals

  • Weight75
  • Coverage54.4%
  • Residual34.2 pts
  • Illustrative

Consistently the least-defended mission in the reference profile, and for an unremarkable reason: a separate program shipped it on a separate schedule, so it inherited the estate’s controls instead of shaping them.

What it delivers

Additional public service lines and secondary portals — smaller in volume, delivered by a different program on a different schedule, and inheriting the estate’s controls rather than driving them.

It exists in the model because it is the mission every agency has and no agency briefs. Its exposure is comparable to the primary portal’s and its attention is not.

Consumed by A narrower public: users of an additional service line the agency delivers alongside the primary one.

Statutory or service-level exposure

Service-level only. No statutory clock attaches.

The obligation
A published availability commitment and nothing behind it. This mission is the control case in the model: it demonstrates what a bill looks like when the only thing enforcing defense is an internal service target.
The clock
None that binds. Which is the exposure — with no clock, an outage here is negotiable, so the mission is always the one that yields when defensive work is scheduled against operational work.
What it costs when it is missed
Reputational, cumulative, and invisible in any reporting the agency does. The failure mode is not a bad week; it is a decade of deferral that shows up as an inherited estate nobody owns.
The availability floor · FO-5
There is no statutory floor, which means the floor is whatever the last exception approval said. That is the finding, not a footnote to it.
Recovery objectives Illustrative
  • RTO48 hours
  • RPO24 hours
  • MTD5 days
What an exercise has to demonstrate · RC-5
A restore performed by the program that owns the service, not by the central platform team, because the recovery assumption that has never been tested is that somebody knows how this system is built.
The part that actually fails
Finding the runbook. On the archetype profile this is the mission whose recovery documentation was written by an integrator whose contract ended, and the exercise usually discovers that before it discovers anything about the backups.

Objectives are declared per mission service under RC-1, restored on a path that does not depend on the production identity plane (RC-3), and verified against an independent integrity record (RC-4). The form of maneuver is M11 Reconstitution, whose indicator is that every objective has been demonstrated within its stated period — not that one exists.

The Bill of Defense · 6 of 10 layers
  • T4Applications and WorkloadsWeight16Share21.3%Layer coverage50%Residual8 pts
  • T1IdentityWeight15Share20%Layer coverage58.1%Residual6.3 pts
  • T3NetworksWeight15Share20%Layer coverage63.2%Residual5.5 pts
  • T5DataWeight12Share16%Layer coverage49.6%Residual6 pts
  • T9Supply ChainWeight9Share12%Layer coverage44.4%Residual5 pts
  • T2DevicesWeight8Share10.7%Layer coverage57.9%Residual3.4 pts
  • Rolled upWeight75Share100%Coverage54.4%Residual34.2 pts · 45.6%

Layers absent from this list contribute nothing to the bill because the mission declares no draw on them: T6 Operational Technology, T7 Workforce, T8 Facilities, TX Cross-Cutting. Absence is a declaration, not an oversight — and it is where the trace below finds what the bill cannot see.

Assets that carry it · 10 outright

A further 23 assets are allocated to this mission without stopping it, carrying 81.3 allocated weight points in total. The full split is in the trace.

Controls in scope · 53

Derived from the layers this mission draws on, not authored against the mission. Nine act on the terrain model itself and therefore apply to every layer by construction; the remaining 36 are named by one or more of the 6 layers in the bill above, for reasons those layers give themselves.

Maneuvers defending it

Ranked by reach: the share of this mission’s weight that sits on layers where the form actually has cataloged techniques. Selecting forms by their declared primary terrain returns all 11 for all 6 missions and differentiates nothing, so the ranking is derived from the technique catalog’s own terrain declarations instead.

Main effort · SM-4

M2 Defense in Depth80% reach

The mission cannot be given a dedicated defensive effort and should not pretend otherwise. The correct concentration is on ensuring no single failure here is decisive — that a compromise of a neglected portal does not become a compromise of the tier behind it.

The widest-reaching form here is M1 Screen / Guard at 100%, and the main effort is M2 anyway. Reach is breadth; main effort is concentration. A form that touches every layer a mission stands on is not thereby the place to mass — that is a claim about where the adversary’s plan is decided, and it is a commander’s judgment rather than an output of this table.

What this bill hidesThis is the lightest bill in the model and the coverage figure is mid-pack, which is the most misleading pairing on the page. Light weight means the mission declared modest dependencies, not that it has few — a mission nobody has assessed will always score as though it depends on little.

05

Public data services

Bulk data and open API surfaces

  • Weight66
  • Coverage53.7%
  • Residual30.6 pts
  • Illustrative

The mission where confidentiality is deliberately low and integrity and availability carry the weight. Its exposure is maximal by design, which is exactly why abuse and enumeration must be modeled as mission risk.

What it delivers

Bulk data products and open API access to the agency’s public holdings — the mission where confidentiality is deliberately low and integrity and availability carry the entire weight.

Its exposure is maximal by design. That is not a defect to be reduced; it is the service. What has to be modeled is abuse of an interface that is working exactly as intended.

Consumed by Researchers, businesses, journalists, automated consumers, and anybody who has ever written a script against a public endpoint.

Statutory or service-level exposure

Dissemination commitment, and the integrity of a public record of fact

The obligation
A published commitment to make the data available in bulk, and a much larger implicit obligation: downstream consumers make decisions on these extracts, so a quietly altered figure propagates into work the agency will never see.
The clock
Publication cadence. A late extract is a service failure; a wrong extract that publishes on time is a much more expensive one and produces no alert.
What it costs when it is missed
Availability failures are visible and forgiven. Integrity failures are invisible and are not — they surface months later, in somebody else’s analysis, with the agency as the cited source.
The availability floor · FO-5
The floor is integrity, not uptime. Withdrawing an extract is an available defensive move; publishing a suspect one to keep the cadence is not.
Recovery objectives Illustrative
  • RTO24 hours
  • RPO24 hours
  • MTD7 days
What an exercise has to demonstrate · RC-5
Reproduction of a published extract from source, byte-for-byte, and comparison against the copy that was actually served — the only exercise that tests the property this mission is actually exposed on.
The part that actually fails
Reproducibility. Extracts are usually generated by a pipeline that has changed since, so proving what was published on a given date requires an artifact nobody kept.

Objectives are declared per mission service under RC-1, restored on a path that does not depend on the production identity plane (RC-3), and verified against an independent integrity record (RC-4). The form of maneuver is M11 Reconstitution, whose indicator is that every objective has been demonstrated within its stated period — not that one exists.

The Bill of Defense · 5 of 10 layers
  • T4Applications and WorkloadsWeight20Share30.3%Layer coverage50%Residual10 pts
  • T3NetworksWeight16Share24.2%Layer coverage63.2%Residual5.9 pts
  • T5DataWeight15Share22.7%Layer coverage49.6%Residual7.6 pts
  • T1IdentityWeight9Share13.6%Layer coverage58.1%Residual3.8 pts
  • T9Supply ChainWeight6Share9.1%Layer coverage44.4%Residual3.3 pts
  • Rolled upWeight66Share100%Coverage53.7%Residual30.6 pts · 46.3%

Layers absent from this list contribute nothing to the bill because the mission declares no draw on them: T2 Devices, T6 Operational Technology, T7 Workforce, T8 Facilities, TX Cross-Cutting. Absence is a declaration, not an oversight — and it is where the trace below finds what the bill cannot see.

Assets that carry it · 6 outright

A further 23 assets are allocated to this mission without stopping it, carrying 75.4 allocated weight points in total. The full split is in the trace.

Controls in scope · 46

Derived from the layers this mission draws on, not authored against the mission. Nine act on the terrain model itself and therefore apply to every layer by construction; the remaining 29 are named by one or more of the 5 layers in the bill above, for reasons those layers give themselves.

Maneuvers defending it

Ranked by reach: the share of this mission’s weight that sits on layers where the form actually has cataloged techniques. Selecting forms by their declared primary terrain returns all 11 for all 6 missions and differentiates nothing, so the ranking is derived from the technique catalog’s own terrain declarations instead.

Main effort · SM-4

M6 Delay100% reach

The adversary here is not trying to get in — they are using the service as designed, faster and more completely than any legitimate consumer. The decisive move is imposing tempo: rate limits, step-up conditions and throttles that make enumeration cost more than it returns.

The widest-reaching form here is M1 Screen / Guard at 100%, and the main effort is M6 anyway. Reach is breadth; main effort is concentration. A form that touches every layer a mission stands on is not thereby the place to mass — that is a claim about where the adversary’s plan is decided, and it is a commander’s judgment rather than an output of this table.

What this bill hidesThis mission draws on no device layer and no workforce layer at all, so both are absent from the bill. That is correct as far as it goes — it has no staff population of its own — and it means the bill cannot see the analyst who curates the extracts or the workstation the curation happens on.

06

Fee and financial operations

Fee, payment and financial data systems

  • Weight127
  • Coverage52.2%
  • Residual60.8 pts
  • Illustrative

The only mission facing a sustained, low-intensity, financially motivated adversary in addition to the nation-state one, which is why its workforce and identity weights are as high as its data weight.

What it delivers

Fee collection, payment processing, refunds, and the accounting record behind all of it — the mission with the most immediate and most quantifiable consequence of failure, and the only one with a permanently interested criminal adversary.

Its identity and workforce weights are as high as its data weight, which is unusual in the model and correct here: fraud against this mission runs through a legitimate-looking authorization far more often than through a technical compromise.

Consumed by Fee payers, the agency’s financial management function, and an annual financial-statement audit.

Statutory or service-level exposure

Financial-integrity obligations and an annual audit

The obligation
Obligations over the accuracy and completeness of the accounting record, tested annually by an independent financial-statement audit, plus the practical duty not to lose public money. A material weakness finding here is a published, named, durable outcome.
The clock
Two clocks at once: the transaction clock, which is immediate, and the audit cycle, which is annual and remembers. A control failure fixed in March is still a finding in the audit that covers March.
What it costs when it is missed
Direct loss, a reportable control deficiency, and a remediation program with an external observer attached to it for at least a year.
The availability floor · FO-5
Payment acceptance is the floor during any period with a statutory fee deadline behind it, because a payment that cannot be made is a filing that cannot be completed — this mission’s availability is another mission’s statutory exposure.
Recovery objectives Illustrative
  • RTO4 hours
  • RPOZero — no committed transaction may be lost
  • MTD24 hours
What an exercise has to demonstrate · RC-5
A restore that reconciles: the recovered ledger balanced against the payment processor’s independent record and against the filings the payments were made for, with any discrepancy enumerated rather than netted.
The part that actually fails
The reconciliation, every time. Recovering the database is routine; proving that the recovered ledger agrees with two external records — and being willing to publish the difference when it does not — is the part organizations discover they cannot do during the exercise.

Objectives are declared per mission service under RC-1, restored on a path that does not depend on the production identity plane (RC-3), and verified against an independent integrity record (RC-4). The form of maneuver is M11 Reconstitution, whose indicator is that every objective has been demonstrated within its stated period — not that one exists.

The Bill of Defense · 8 of 10 layers
  • T1IdentityWeight25Share19.7%Layer coverage58.1%Residual10.5 pts
  • T5DataWeight25Share19.7%Layer coverage49.6%Residual12.6 pts
  • T4Applications and WorkloadsWeight16Share12.6%Layer coverage50%Residual8 pts
  • T7WorkforceWeight16Share12.6%Layer coverage44.9%Residual8.8 pts
  • T3NetworksWeight15Share11.8%Layer coverage63.2%Residual5.5 pts
  • T2DevicesWeight12Share9.4%Layer coverage57.9%Residual5.1 pts
  • T9Supply ChainWeight12Share9.4%Layer coverage44.4%Residual6.7 pts
  • T8FacilitiesWeight6Share4.7%Layer coverage40.5%Residual3.6 pts
  • Rolled upWeight127Share100%Coverage52.2%Residual60.8 pts · 47.8%

Layers absent from this list contribute nothing to the bill because the mission declares no draw on them: T6 Operational Technology, TX Cross-Cutting. Absence is a declaration, not an oversight — and it is where the trace below finds what the bill cannot see.

Assets that carry it · 9 outright

A further 31 assets are allocated to this mission without stopping it, carrying 146.9 allocated weight points in total. The full split is in the trace.

Controls in scope · 64

Derived from the layers this mission draws on, not authored against the mission. Nine act on the terrain model itself and therefore apply to every layer by construction; the remaining 47 are named by one or more of the 8 layers in the bill above, for reasons those layers give themselves.

Maneuvers defending it

Ranked by reach: the share of this mission’s weight that sits on layers where the form actually has cataloged techniques. Selecting forms by their declared primary terrain returns all 11 for all 6 missions and differentiates nothing, so the ranking is derived from the technique catalog’s own terrain declarations instead.

Main effort · SM-4

M7 Counterattack75.6% reach

This is the one mission in continuous contact. Against a sustained, financially motivated adversary the decisive measurement is not whether an intrusion occurred but how quickly the current one is evicted, which makes counterattack the effort everything else supports.

The widest-reaching form here is M1 Screen / Guard at 100%, and the main effort is M7 anyway. Reach is breadth; main effort is concentration. A form that touches every layer a mission stands on is not thereby the place to mass — that is a claim about where the adversary’s plan is decided, and it is a commander’s judgment rather than an output of this table.

What this bill hidesThis bill ties for the heaviest weight in the model and its residual points are the highest of the six, which is the correct answer arrived at slightly wrongly: the weight is driven by data and identity, and the loss event this mission actually faces is fraud through legitimate authorization — a scenario that raises no layer’s coverage gap and therefore appears nowhere in the arithmetic.

Bidirectional Traceability

The Model Promises the Trace Runs Both Ways. One Direction Is Stronger Than the Other.

Pick a mission and see everything defending it: that is the six sheets above, and it is complete. Pick an asset and see every mission it serves: that is the table below, and it is weaker in three specific ways, all of them named rather than smoothed over.

Exhibit 4

Direction Two: Every Asset, and the Missions It Serves

AssetTowerMissions it carries outrightMissions it is allocated to, by shareAllocated weight
A-01 ICAM identity provider and policy decision pointT125.1 pts
A-02 PKI and PIV credential serviceT115 pts
A-03 External-user account directoryT120 pts
A-04 Privileged accounts and the access brokerT1None20 pts
A-05 Service and workload identitiesT1None16 pts
A-06 Mission-staff laptopsT215 pts
A-07 Contractor and integrator endpointsT2None15 pts
A-08 Server and virtual-machine fleetT212.1 pts
A-09 Build agents and developer workstationsT2None16 pts
A-10 TIC 3.0 access pointsT325.1 pts
A-11 Edge delivery and volumetric scrubbingT320.1 pts
A-12 Web application firewall fronting the public tierT316 pts
A-13 The public-tier / mission-tier boundaryT320.1 pts
A-14 Authoritative and recursive DNST316 pts
A-15 The public service portalT424.8 pts
A-16 The case filing front doorT424.8 pts
A-17 The case processing systemT415 pts
A-18 The administrative adjudication docketT412 pts
A-19 Secondary public service portalsT415 pts
A-20 The public bulk data and open API surfaceT415 pts
A-21 The fee and payment applicationT424.8 pts
A-22 The CI/CD pipelineT4None19.8 pts
A-23 Container platform and orchestrationT4None16 pts
A-24 Secrets store for workload credentialsT4None15 pts
A-25 Sensitive mission recordsT520.1 pts
A-26 The external-user PII storeT520.1 pts
A-27 The fee and financial databaseT515 pts
A-28 Published bulk-data extractsT515 pts
A-29 Audit and telemetry record storesT5None12.1 pts
A-30 Analytic and non-production copies of mission dataT5None15.9 pts
A-31 Building control and physical access systemsT6NoneNothing. No mission draws on T6, so this asset allocates to no mission at all.0
A-32 Public-counter and laboratory instrumentationT6Nothing. No mission draws on T6, so this asset allocates to no mission at all.0
A-33 Engineering workstations for facility systemsT6NoneNothing. No mission draws on T6, so this asset allocates to no mission at all.0
A-34 The privileged administrator populationT7None19.9 pts
A-35 Mission staff with volume record accessT716 pts
A-36 Contractor and vendor staff with production accessT7None19.9 pts
A-37 The defending team itselfT7None12 pts
A-38 Primary data center and equipment roomsT810 pts
A-39 Environmental plant serving productionT8None8 pts
A-40 Vendor maintenance routes into production spaceT8None16 pts
A-41 Managed service providers with production accessT9None19.8 pts
A-42 Third-party components in mission applicationsT9None16.2 pts
A-43 Vendor update channels into the estateT9None19.8 pts
A-44 The telemetry and analytics platformTXNoneNothing. No mission draws on TX, so this asset allocates to no mission at all.0
A-45 Orchestration and response toolingTXNoneNothing. No mission draws on TX, so this asset allocates to no mission at all.0
A-46 The rules of engagement and the cycle recordTXNoneNothing. No mission draws on TX, so this asset allocates to no mission at all.0

A-01 ICAM identity provider and policy decision point

Tower
T1
Missions it is allocated to, by share
Allocated weight
25.1 pts

A-02 PKI and PIV credential service

Tower
T1
Missions it is allocated to, by share
Allocated weight
15 pts

A-03 External-user account directory

Tower
T1
Missions it is allocated to, by share
Allocated weight
20 pts

A-04 Privileged accounts and the access broker

Tower
T1
Missions it carries outright
None
Missions it is allocated to, by share
Allocated weight
20 pts

A-05 Service and workload identities

Tower
T1
Missions it carries outright
None
Missions it is allocated to, by share
Allocated weight
16 pts

A-06 Mission-staff laptops

Tower
T2
Missions it is allocated to, by share
Allocated weight
15 pts

A-07 Contractor and integrator endpoints

Tower
T2
Missions it carries outright
None
Missions it is allocated to, by share
Allocated weight
15 pts

A-08 Server and virtual-machine fleet

Tower
T2
Missions it carries outright
Missions it is allocated to, by share
Allocated weight
12.1 pts

A-09 Build agents and developer workstations

Tower
T2
Missions it carries outright
None
Missions it is allocated to, by share
Allocated weight
16 pts

A-10 TIC 3.0 access points

Tower
T3
Missions it is allocated to, by share
Allocated weight
25.1 pts

A-11 Edge delivery and volumetric scrubbing

Tower
T3
Missions it carries outright
Missions it is allocated to, by share
Allocated weight
20.1 pts

A-12 Web application firewall fronting the public tier

Tower
T3
Missions it is allocated to, by share
Allocated weight
16 pts

A-13 The public-tier / mission-tier boundary

Tower
T3
Missions it carries outright
Missions it is allocated to, by share
Allocated weight
20.1 pts

A-14 Authoritative and recursive DNS

Tower
T3
Missions it is allocated to, by share
Allocated weight
16 pts

A-15 The public service portal

Tower
T4
Missions it carries outright
Missions it is allocated to, by share
Allocated weight
24.8 pts

A-16 The case filing front door

Tower
T4
Missions it carries outright
Missions it is allocated to, by share
Allocated weight
24.8 pts

A-17 The case processing system

Tower
T4
Missions it carries outright
Missions it is allocated to, by share
Allocated weight
15 pts

A-18 The administrative adjudication docket

Tower
T4
Missions it carries outright
Missions it is allocated to, by share
Allocated weight
12 pts

A-19 Secondary public service portals

Tower
T4
Missions it carries outright
Missions it is allocated to, by share
Allocated weight
15 pts

A-20 The public bulk data and open API surface

Tower
T4
Missions it carries outright
Missions it is allocated to, by share
Allocated weight
15 pts

A-21 The fee and payment application

Tower
T4
Missions it carries outright
Missions it is allocated to, by share
Allocated weight
24.8 pts

A-22 The CI/CD pipeline

Tower
T4
Missions it carries outright
None
Missions it is allocated to, by share
Allocated weight
19.8 pts

A-23 Container platform and orchestration

Tower
T4
Missions it carries outright
None
Missions it is allocated to, by share
Allocated weight
16 pts

A-24 Secrets store for workload credentials

Tower
T4
Missions it carries outright
None
Missions it is allocated to, by share
Allocated weight
15 pts

A-25 Sensitive mission records

Tower
T5
Missions it carries outright
Missions it is allocated to, by share
Allocated weight
20.1 pts

A-26 The external-user PII store

Tower
T5
Missions it is allocated to, by share
Allocated weight
20.1 pts

A-27 The fee and financial database

Tower
T5
Missions it carries outright
Missions it is allocated to, by share
Allocated weight
15 pts

A-28 Published bulk-data extracts

Tower
T5
Missions it carries outright
Missions it is allocated to, by share
Allocated weight
15 pts

A-29 Audit and telemetry record stores

Tower
T5
Missions it carries outright
None
Missions it is allocated to, by share
Allocated weight
12.1 pts

A-30 Analytic and non-production copies of mission data

Tower
T5
Missions it carries outright
None
Missions it is allocated to, by share
Allocated weight
15.9 pts

A-31 Building control and physical access systems

Tower
T6
Missions it carries outright
None
Missions it is allocated to, by share
Nothing. No mission draws on T6, so this asset allocates to no mission at all.
Allocated weight
0

A-32 Public-counter and laboratory instrumentation

Tower
T6
Missions it carries outright
Missions it is allocated to, by share
Nothing. No mission draws on T6, so this asset allocates to no mission at all.
Allocated weight
0

A-33 Engineering workstations for facility systems

Tower
T6
Missions it carries outright
None
Missions it is allocated to, by share
Nothing. No mission draws on T6, so this asset allocates to no mission at all.
Allocated weight
0

A-34 The privileged administrator population

Tower
T7
Missions it carries outright
None
Missions it is allocated to, by share
Allocated weight
19.9 pts

A-35 Mission staff with volume record access

Tower
T7
Missions it carries outright
Missions it is allocated to, by share
Allocated weight
16 pts

A-36 Contractor and vendor staff with production access

Tower
T7
Missions it carries outright
None
Missions it is allocated to, by share
Allocated weight
19.9 pts

A-37 The defending team itself

Tower
T7
Missions it carries outright
None
Missions it is allocated to, by share
Allocated weight
12 pts

A-38 Primary data center and equipment rooms

Tower
T8
Missions it carries outright
Missions it is allocated to, by share
Allocated weight
10 pts

A-39 Environmental plant serving production

Tower
T8
Missions it carries outright
None
Missions it is allocated to, by share
Allocated weight
8 pts

A-40 Vendor maintenance routes into production space

Tower
T8
Missions it carries outright
None
Missions it is allocated to, by share
Allocated weight
16 pts

A-41 Managed service providers with production access

Tower
T9
Missions it carries outright
None
Missions it is allocated to, by share
Allocated weight
19.8 pts

A-42 Third-party components in mission applications

Tower
T9
Missions it carries outright
None
Missions it is allocated to, by share
Allocated weight
16.2 pts

A-43 Vendor update channels into the estate

Tower
T9
Missions it carries outright
None
Missions it is allocated to, by share
Allocated weight
19.8 pts

A-44 The telemetry and analytics platform

Tower
TX
Missions it carries outright
None
Missions it is allocated to, by share
Nothing. No mission draws on TX, so this asset allocates to no mission at all.
Allocated weight
0

A-45 Orchestration and response tooling

Tower
TX
Missions it carries outright
None
Missions it is allocated to, by share
Nothing. No mission draws on TX, so this asset allocates to no mission at all.
Allocated weight
0

A-46 The rules of engagement and the cycle record

Tower
TX
Missions it carries outright
None
Missions it is allocated to, by share
Nothing. No mission draws on TX, so this asset allocates to no mission at all.
Allocated weight
0
Two relations, deliberately kept apart. Carries outright is authored per asset and means the mission stops without it. Allocated is arithmetic: an asset’s weight is split across the missions drawing on its tower, in proportion to their declared draws, so the shares on any layer sum to one. The first is precise and sparse; the second is complete and coarse. Neither is presented as the other.

Where the Second Direction Is Weaker, Stated in Numbers

  1. Allocation resolves to a tower, not to an asset

    The register knows which tower an asset sits in; the mission declares a draw on that tower. Nothing joins a specific asset to a specific mission except the 24 authored “carries outright” relations. So the allocated answer for shared infrastructure is every mission drawing on that layer — true, arithmetically clean, and low-resolution. The identity provider allocates to all six missions because all six draw on identity, which is correct and is not the same as knowing which mission would notice first.

  2. 22 of 46 assets carry no mission outright

    The pipeline, the access broker, the telemetry platform, every supplier row: 22 assets — 47.8% of the register — stop no mission if they stop. For those, allocation is the only answer the trace can give. Widening the relation to “is relevant to” would fill the column and destroy it, because then everything would carry everything.

  3. 6 assets allocate to nothing at all

    2 of the 10 layers — T6 Operational Technology and TX Cross-Cutting — are drawn on by no mission in the model. Every asset sitting on them therefore allocates to no mission, and the arithmetic is not wrong: the enabler layer is deliberately scored as an enabler rather than as ground, and the operational-technology layer carries no declared mission draw. It does mean the trace returns an empty answer for the telemetry platform and the rules of engagement, which are two of the assets a defender would least like to be told nothing about.

One dependency the register asserts and the bill cannot price
  • A-32 Public-counter and laboratory instrumentation is declared a hard dependency of Secondary public service — the mission stops without it — and it sits on T6 Operational Technology, which that mission’s draw vector gives no weight to at all. Its bill therefore prices this dependency at zero.

This is left visible on purpose. It is the most useful thing the second direction produces, and it exists only because the two directions were built from different data: the draw vectors are declared per mission in the terrain reference, and the dependencies are declared per asset here. Where they disagree, one of them is wrong — and finding out which is a conversation with a mission owner, not an edit to a table. A model that quietly reconciled the two would have destroyed the finding to protect the arithmetic.

What the Numbers Are For

Weight Against Coverage Gap Is a Ranked Backlog, Not a Dashboard.

A coverage percentage that does not change what gets funded next quarter has cost the agency the effort of computing it. Multiplying weight by the gap turns the whole model into an ordered list, which is the only output of it that anybody acts on.

Exhibit 5

The Twelve Heaviest Remediation Items, Ranked by Residual Weight Points

  1. 01

    A-01 ICAM identity provider and policy decision point

    • Weight25
    • Coverage50%
    • Residual12.5 pts
    • TowerT1

    Stops Public service delivery, Case processing and adjudication, Administrative adjudication, Secondary public service, Public data services, Fee and financial operations. Allocated weight across every mission it serves: 25.1 points.

  2. 02

    A-15 The public service portal

    • Weight25
    • Coverage50%
    • Residual12.5 pts
    • TowerT4

    Stops Public service delivery. Allocated weight across every mission it serves: 24.8 points.

  3. 03

    A-16 The case filing front door

    • Weight25
    • Coverage50%
    • Residual12.5 pts
    • TowerT4

    Stops Public service delivery, Administrative adjudication. Allocated weight across every mission it serves: 24.8 points.

  4. 04

    A-21 The fee and payment application

    • Weight25
    • Coverage50%
    • Residual12.5 pts
    • TowerT4

    Stops Fee and financial operations. Allocated weight across every mission it serves: 24.8 points.

  5. 05

    A-30 Analytic and non-production copies of mission data

    • Weight16
    • Coverage25%
    • Residual12 pts
    • TowerT5

    Stops no mission outright. Allocated weight across every mission it serves: 15.9 points — which is the entire funding argument for it, and it is a weaker one than the number deserves.

  6. 06

    A-35 Mission staff with volume record access

    • Weight16
    • Coverage25%
    • Residual12 pts
    • TowerT7

    Stops Case processing and adjudication, Administrative adjudication. Allocated weight across every mission it serves: 16 points.

  7. 07

    A-40 Vendor maintenance routes into production space

    • Weight16
    • Coverage25%
    • Residual12 pts
    • TowerT8

    Stops no mission outright. Allocated weight across every mission it serves: 16 points — which is the entire funding argument for it, and it is a weaker one than the number deserves.

  8. 08

    A-42 Third-party components in mission applications

    • Weight16
    • Coverage25%
    • Residual12 pts
    • TowerT9

    Stops no mission outright. Allocated weight across every mission it serves: 16.2 points — which is the entire funding argument for it, and it is a weaker one than the number deserves.

  9. 09

    A-04 Privileged accounts and the access broker

    • Weight20
    • Coverage50%
    • Residual10 pts
    • TowerT1

    Stops no mission outright. Allocated weight across every mission it serves: 20 points — which is the entire funding argument for it, and it is a weaker one than the number deserves.

  10. 10

    A-13 The public-tier / mission-tier boundary

    • Weight20
    • Coverage50%
    • Residual10 pts
    • TowerT3

    Stops Case processing and adjudication, Administrative adjudication. Allocated weight across every mission it serves: 20.1 points.

  11. 11

    A-22 The CI/CD pipeline

    • Weight20
    • Coverage50%
    • Residual10 pts
    • TowerT4

    Stops no mission outright. Allocated weight across every mission it serves: 19.8 points — which is the entire funding argument for it, and it is a weaker one than the number deserves.

  12. 12

    A-25 Sensitive mission records

    • Weight20
    • Coverage50%
    • Residual10 pts
    • TowerT5

    Stops Case processing and adjudication, Administrative adjudication. Allocated weight across every mission it serves: 20.1 points.

Illustrative — the Federal Reference Agency profile, not an assessment of any real estate. Ranked over assets rather than sub-towers, because a backlog item has to be a thing somebody can be assigned. The right-hand column is the funding argument: an item that stops a mission outright is a different conversation from one that merely carries allocated weight, even at identical residual points — compare the pipeline with the portal.

The computation is CE-4; the ranking is CE-5. Both are controls rather than practices for the same reason: a rollup performed once, at authorization time, describes an estate that no longer exists by the time anybody reads it. The register’s currency is TM-6, and every figure above inherits the staleness of the inventory it was computed from.

What This Page Does Not Tell You

Four Limits, Stated so Nobody Has to Discover Them in a Briefing.

Reach Is Normalized per Mission, so It Does Not Compare Across Them

A form’s reach is the share of that mission’s weight it touches. A mission drawing on five layers is easier to reach completely than one drawing on eight, so the narrowest bill on the page shows the highest reach figures. Reach ranks forms within a mission and says nothing across missions.

Coverage Is a Conversion, Not a Measurement

Every percentage traces back to a four-rung maturity judgment converted to 25, 50, 75 or 100. The conversion is the model’s own convention. It makes maturity averageable, which is useful, and it invites more confidence than a four-point ordinal scale can carry.

The Register Is an Archetype, Not an Inventory

46 rows stand in for an estate that would run to tens of thousands. Aggregation at this level is what makes the model briefable and is also what hides the one unpatched host. The register is the shape of an answer; the inventory that TM-1 demands is the answer.

Nothing Here Is Denominated in Money

The allocation borrows a shape, not a currency. This model does not cost a control, price a maneuver, or produce a budget artifact — so “where to spend the next control dollar” is a ranking of what is exposed, not an estimate of what closing it costs.

Elsewhere in the Manual

What the Bill Is Computed from, and What It Feeds.