ASOM-Fedv6.1Open the explorer
TM-6 · Terrain Management

Terrain Currency

Control Statement

The terrain overlay shall be refreshed at a defined cadence and upon any material architectural change.

Purpose. To keep the overlay current against both the clock and the change, so that planning is conducted against ground as it currently is.

Discussion

A stale overlay is more dangerous than no overlay, because it is trusted. Currency has two triggers, and a program honoring only the cadence will plan from a map that a deployment invalidated the week after it was drawn. Wiring the change trigger into change management is what stops the second trigger depending on someone remembering.

Goals and Metrics

A metric that cannot come out badly is not a metric. Each of these is capable of reporting that the control is not working.

The overlay is current against its stated cadence.
  • Age of the overlay against its declared refresh interval
  • Number of material architectural changes that did not trigger a refresh

Accountability

Exactly one role is accountable, and every other role carries at least Informed — no control in the published catalog leaves a role with zero relationship to it. That is a stated property of how these were authored, not a coincidence, and not a claim that every role's work is worth equal attention here.

AOCTISOCHUNTPLATISSO
Authorizing Official / CISO: AccountableCyber Threat Intelligence cell: InformedSOC / Defensive Operations: InformedHunt team: InformedPlatform and product owners: ResponsibleGovernance / RMF / ISSO: Consulted

AO Authorizing Official / CISOCTI Cyber Threat Intelligence cellSOC SOC / Defensive OperationsHUNT Hunt teamPLAT Platform and product ownersISSO Governance / RMF / ISSO

  • AccountableAuthorizing Official / CISO
  • InformedCyber Threat Intelligence cell
  • InformedSOC / Defensive Operations
  • InformedHunt team
  • ResponsiblePlatform and product owners
  • ConsultedGovernance / RMF / ISSO

Inputs and Outputs

Consumes

Produces

Activities

  1. L2Refresh the overlay at a stated interval.
  2. L2Record each refresh with its date and trigger.
  3. L2Retain superseded overlays rather than overwriting them.
  4. L3Define the refresh cadence and the rationale for its interval.
  5. L3Define what counts as a material architectural change, specifically enough for a change board to apply without judgment calls.
  6. L3Wire the change-triggered refresh into the change management process so it fires without depending on memory.
  7. L3Record a lapse in cadence as a finding with justification rather than allowing silent slippage.
  8. L4Trend overlay age at time of use and the elapsed time from material change to refresh.
  9. L4Measure drift per cycle as the delta between successive overlays, and escalate where drift exceeds the interval's assumption.
  10. L5Adjust the cadence from measured drift, shortening it where the estate moves faster than the interval assumed.

Measurement

Outcome

Percentage of cycles meeting the defined cadence.

Performance

Median elapsed time from material change to overlay refresh.

Evidence and Assessment

Evidence expected

Cycle history with dates; snapshot series; change-trigger record.

Assessment procedure

Examine cycle dates against the defined cadence; interview on the change-triggered refresh process; test that a recent material change produced a refresh.

Related Guidance

Inherits
  • CM-8(1)
  • CA-7
Satisfies
  • ID.AM-08
  • ID.IM-03

Position in the Chain

Derived from the other controls’ own declarations, so the two directions cannot disagree.

Where This Control Is Used

Derived, in every case, from the declaration at the other end: the forms whose techniques name this control, the artifacts whose producing and consuming controls include it, the layers whose control lists name it, and the roles its own accountability chart puts to work. Nothing here is authored on this page, so the sheet cannot claim an edge the other end does not.

Forms of Maneuver It Assesses

  • M1Screen / GuardGain early warning and buy reaction time before the adversary touches key terrain.5 of 15 techniques — M1.01, M1.02, M1.12, M1.14, M1.15
  • M2Defense in DepthEnsure no single failure is decisive.2 of 18 techniques — M2.05, M2.11
  • M3EnvelopmentMake identity, not network location, the decisive plane — surround the adversary with policy.1 of 20 techniques — M3.08
  • M10Exploitation & PursuitConvert contact into durable advantage rather than closing the ticket.1 of 7 techniques — M10.03

Terrain It Is Named On

Applies to all ten layersAges the overlay. A layer’s coverage figure inherits the staleness of the inventory it was computed from.

Artifacts It Stands On

  • producesCyber Terrain OverlayThe positional map of the estate: every element with a defensive layer, a defensive weight, a named accountable owner and its adjacencies. Not an asset inventory — an inventory enumerates, an overlay positions.
  • producesChange recordEvery defensive action carried out, stamped twice — at the decision and at the effect. A thin, unglamorous table, and the one the headline metric is computed from.
  • consumesCycle cadence and calendarThe declared length of a cycle, its close date, and the refresh intervals that inherit from it. Makes “per cycle” a measurable unit rather than a figure of speech.

Roles It Puts to Work