ASOM-Fedv6.1Open the explorer
EN-2 · Engagement and Pursuit

Engagement Reconstruction

Control Statement

For every declared incident, the organization shall reconstruct what took place — the entry, the movement, the dwell interval and the scope reached — and shall record the actions taken during the investigation.

Purpose. To establish what actually happened, since every consolidation activity depends on a reconstruction and none of them can be performed without one.

Discussion

M10's stated precondition is a dwell reconstruction, and the framework's own material observes that the reconstruction gets harder every day after the ticket closes. This is the control that makes it a requirement rather than an intention. The reconstruction is also load-bearing far beyond the incident it describes: RC-4 selects a restore point against it, TA-2 corrects the imported dwell estimate against it, M10.02 verifies avenue closure against it, and CE-2 revises intelligence requirements from what it showed could not be seen. An agency that closes incidents without reconstructing them has disabled four controls it believes it operates.

Goals and Metrics

A metric that cannot come out badly is not a metric. Each of these is capable of reporting that the control is not working.

Every declared incident is reconstructed before it is closed.
  • Percentage of declared incidents with a completed reconstruction
  • Percentage of reconstructions carrying an explicit confidence level
Reconstruction tests the dwell estimate rather than restating it.
  • Divergence between reconstructed dwell and the TA-2 estimate
  • Count of visibility gaps found during reconstruction

Accountability

Exactly one role is accountable, and every other role carries at least Informed — no control in the published catalog leaves a role with zero relationship to it. That is a stated property of how these were authored, not a coincidence, and not a claim that every role's work is worth equal attention here.

AOCTISOCHUNTPLATISSO
Authorizing Official / CISO: AccountableCyber Threat Intelligence cell: ConsultedSOC / Defensive Operations: ConsultedHunt team: ResponsiblePlatform and product owners: InformedGovernance / RMF / ISSO: Informed

AO Authorizing Official / CISOCTI Cyber Threat Intelligence cellSOC SOC / Defensive OperationsHUNT Hunt teamPLAT Platform and product ownersISSO Governance / RMF / ISSO

  • AccountableAuthorizing Official / CISO
  • ConsultedCyber Threat Intelligence cell
  • ConsultedSOC / Defensive Operations
  • ResponsibleHunt team
  • InformedPlatform and product owners
  • InformedGovernance / RMF / ISSO

Inputs and Outputs

Consumes

Produces

Activities

  1. L2Reconstruct the entry point, the movement path and the scope reached for each declared incident.
  2. L2Estimate the dwell interval from first access to detection.
  3. L2Record the actions taken during the investigation, with times and actors.
  4. L3Estimate incident magnitude — elements affected, data reached, mission impact — and record the confidence level per CE-3.
  5. L3Record what could *not* be reconstructed and why, since a visibility gap is the most actionable output of an engagement and is otherwise lost.
  6. L3Reconcile the reconstructed path against the terrain overlay and record every place the map was wrong, feeding TM-1 and M10.03.
  7. L3Complete reconstruction before the incident is closed, with closure withheld until it is recorded.
  8. L4Measure the proportion of declared incidents carrying a completed reconstruction, distinguishing closed from reconstructed.
  9. L4Compare reconstructed dwell against the imported estimate under TA-2, and feed the divergence back into it.
  10. L5Build a local dwell series from accumulated reconstructions, transitioning TA-2 from an imported figure to a measured one.

Measurement

Outcome

Percentage of declared incidents with a completed reconstruction.

Performance

Divergence between reconstructed dwell and the `TA-2` estimate.

Evidence and Assessment

Evidence expected

Reconstruction per incident with dwell, scope, magnitude and confidence; investigation action record; visibility gap findings; overlay corrections.

Assessment procedure

Examine reconstructions for completeness; test that closure was withheld pending reconstruction; examine whether visibility gaps were raised as findings; compare reconstructed dwell against the estimate in use.

Related Guidance

Inherits
  • IR-4(4)
  • AU-6
  • IR-4
Satisfies
  • RS.AN-03
  • RS.AN-06
  • RS.AN-08
  • DE.AE-04

Position in the Chain

Derived from the other controls’ own declarations, so the two directions cannot disagree.

Where This Control Is Used

Derived, in every case, from the declaration at the other end: the forms whose techniques name this control, the artifacts whose producing and consuming controls include it, the layers whose control lists name it, and the roles its own accountability chart puts to work. Nothing here is authored on this page, so the sheet cannot claim an edge the other end does not.

Forms of Maneuver It Assesses

  • M10Exploitation & PursuitConvert contact into durable advantage rather than closing the ticket.3 of 7 techniques — M10.02, M10.03, M10.04
  • M7CounterattackSeize the initiative and evict before the adversary reaches the objective.1 of 17 techniques — M7.12

Terrain It Is Named On

Applies to all ten layersReconstruction is what establishes how far the adversary actually got across this layer, and it is what corrects the dwell estimate the layer’s tempo figures use.

Artifacts It Stands On

  • producesEngagement recordThe record of one engagement end to end: what was declared and on what criteria, the reconstruction with its dwell, scope and confidence, the evidence preserved and its custody, the authority exercised, and the verification that eradication actually happened before recovery began.
  • consumesCyber Terrain OverlayThe positional map of the estate: every element with a defensive layer, a defensive weight, a named accountable owner and its adjacencies. Not an asset inventory — an inventory enumerates, an overlay positions.
  • consumesTrust zones and the connection registerThe zone boundaries and the permitted- and denied-path register — the graph reachability is actually walked over, reconciled against observed flow telemetry rather than against intended configuration.

Roles It Puts to Work